最后介绍了服务管理的实施,第一年的项目实施结果以及获得的经验和教训总结。
At last, it introduces the implementation of the service management, the result of the first year and the obtained relevant lessons and experience.
项目实施基本情况,项目小区实施情况,项目实施结果,工作措施,实施工作总结。
Project implementation basic situation, project plot implementation situation, project implementation result, work measure, implementation work summary.
结果,他们实施了一项使用广播肥皂剧鼓励农民停止不利于环境的做法的项目。
The result is an innovative project using a radio soap opera to encourage farmers to halt environmentally unsound practices.
项目组组织人员对纠正措施的实施效果进行评价并记录评价结果。
The project group organizes person to evaluate the effect of redressing measures and record the evaluation result.
已经由项目管理团队为了保证项目将来的实施结果符合项目管理计划的要求而付诸实施的批准的纠正措施。 。
Thee approved corrective actions that have been implemented by the project management team to bring expected future project performance into conformance with the project management plan.
由于审计项目管理方式、层次不同,各会计师事务所实施同样的审计准则往往产生不同的结果。
As the methods of management of audit project, different levels, accountant's firm to implement the same auditing standards tend to produce different results.
选择有代表性的扩散模型客观地反映污染物对环境影响的结果才有助于指导建设项目的实施。
The choice of a represent dispersion model might reflect the pollution impact on environment and guide implement of construction items.
已经由项目管理团队为了保证项目将来的实施结果符合项目管理计划的要求而付诸实施的批准的纠正措施。
The approved corrective actions that have been implemented by the project management team to bring expected future project performance into conformance with the project management plan.
论文研究结果对石油设计企业实施项目管理有一定的参考价值。
The research results given by this thesis have practical reference for petroleum design engineering enterprise with implementing project management.
实现价值技术从项目的启动开始一直到项目收尾结束始终测量项目的实施结果。
The earned value technique measures performance of the project as it moves from project initiation through project closure.
提要:项目教学法的五个阶段:确定项目任务,制订计划,实施计划,检查评估,归档或结果应用。
The five stages of project teaching: identification of project tasks, develop plans, implement plans, inspection and evaluation, archiving, or results are applied.
减少这300个社区的贫困,反过来,作为结果,必将促进安全水供应及卫生设施项目的实施。
Poverty reduced in the 300 communities, as a result of and, in turn, facilitating the safe water supply and sanitation improvement.
项目的数目、教育的水平、以及整个实施和执行的方法以可以消化的步调进行并直接与策略和结果相联系。
The number of projects, the levels of education, and the whole deployment and execution approach occur at a digestible pace, with a direct link to strategy and results.
在对调查结果分析后,提出了基于知识管理的信息系统项目管理模式及信息系统项目管理中的知识管理实施框架。
ISPM mode based on knowledge management and implementation framework of knowledge management in ISPM are brought forward after analyzing investigation outcomes.
研究结果:组织机构建设不健全,将导致项目实施管理不规范,直接影响项目工程的质量和资金安全。
The results indicate that Organization distemperedness will lead to the nonstandard project management and also it will influence the quality of the project and the safety of the fund.
本文将介绍项目的实施情况和试验的初步结果,并展望RFID技术在邮政行业其他领域的应用前景。
The implementing situation and testing results will be introduced in this article, and the foreground of application of RFID technology will be prospected in other areas of post industry.
根据已建立的项目质量实施能力指标体系演示对其进行多级模糊综合评价过程,分析评价结果及其监督实践中的应用。
The process for carrying out multi-step fuzzy comprehensive evaluation on it by its built rating index system is demonstrated. Rating outcome and application for supervisory practice are analyzed.
本文将介绍项目的实施情况和试验的初步结果,并展望RFID技术在邮政行业其他领域的应用前景。
This paper introduces the process and initial result of the experiment and make a prospect on the application of RFID on post industry and other fields.
研究结果表明:CM型代建作为一种新型的公共项目组织实施方式,能够更好的改善项目绩效。
The study indicates: as a new public project implementation model, CM-agent can improve project performance better.
如果项目管理者不能从全局的观点综合判断项目是否处于健康状态并积极采取应对措施,项目实施就可能出现问题,甚至酿成无法挽救的结果。
If the project managers cannot tell whether the project is in good health condition by an overall viewpoint, the tiny defects during construction will accumulate and maybe finally lead to catastrophe.
如果项目管理者不能从全局的观点综合判断项目是否处于健康状态并积极采取应对措施,项目实施就可能出现问题,甚至酿成无法挽救的结果。
If the project managers cannot tell whether the project is in good health condition by an overall viewpoint, the tiny defects during construction will accumulate and maybe finally lead to catastrophe.
应用推荐