• 目前正在开展项目前期工作

    At present, the project is under preparation.

    youdao

  • 目前正在开展项目前期工作

    At present, the work of pre-project is being carried out.

    youdao

  • 项目前期工作各项专业规划正在进行。

    Prophase Work: General program and specialized program are undergoing.

    youdao

  • 项目前期工作面临的风险对于整个项目成败来说至关重要。

    Project Preparation for the overall project risk is critical to the success or failure.

    youdao

  • 本文资信调查中外各作项目前期工作中的重要性阐述。

    The paper clarifies the importance of the credit investigation in the previous work concerning the joint- venture projects.

    youdao

  • 铁路线路方案比选铁路建设项目前期工作中一项重要内容

    Scheme comparison of the railway construction is an important content in the early stage of working.

    youdao

  • 项目前期工作进展情况完成总体规划设计建设用地报批,进入项目招商阶段

    Preliminary and progress: The design of gross layout has been accomplished, the building plot has been approved, and the project is in its stage of inviting outside investments.

    youdao

  • 我国目前建设项目前期工作现状存在一些缺陷设计意识不够多种原因导致的。

    In China, there are lots of problems in this stage, because of many factors, such as low consciousness of designers.

    youdao

  • 项目前期工作进展情况:完成可行性报告论证项目总体规划正在申报中土地选定

    V. Preliminary work: the feasibility report and demonstration have been completed, overall planning of the Project is under declaration, and land has been selected.

    youdao

  • 项目前期工作完成片区控制性详细规划环境影响评估地质灾害评估,开工建设主干道

    The initial project work: the controlling detailed plan, Environment Influence Assessment and the Geological Disaster Assessment have been completed. The main road has been started to build.

    youdao

  • [摘要]建设项目成本管理包括项目前期工作成本管理、建设过程成本管理工程结算成本管理。

    Abstract: construction project cost management includes cost management of project preparatory work, of construction process and of engineer settlement.

    youdao

  • 着重烧碱的生产方法能源消耗产品质量、生产成本进行比较,项目前期工作优化技术决策

    Comparison of productive method, energy consumption, product quality and productive cost is emphasized, for optimal technical decision in the prophase project.

    youdao

  • 项目前期工作进展情况完成,2012年已立项,列入2013年福建省重点建设项目

    V. Preliminary work: the feasibility study has been finished; the Project has passed the review since 2012 and been listed in 2013 key construction projects of Fujian Province.

    youdao

  • 着重对聚氯乙烯生产方法能源消耗、生产成本环境保护进行比较项目前期工作优化技术决策

    Comparison of productive method, energy consumption, productive cost and environmental protection, for optimal technical decision in the prophase project.

    youdao

  • 着重对聚氯乙烯生产方法能源消耗、生产成本环境保护进行比较项目前期工作优化技术决策

    Comparison of productive method, energy consumption, productive cost and environmental protection, for optimal technical decision in the prophase project.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定