为保证顺利脱模,模具设计采用了双脱模机构,即定模采用杠杆、推杆顶出机构,动模采用推管二级顶出机构。
As a result, a mould with double stripper mechanism was needed, that is to say, there were levers and ejector pins on the stationary mould half and ejector pipes on the moving mould half.
顶模是弯管全套模具的重要部件,它的设计直接影响弯管质量和弯管效率。
The top die is the important component of the complete set of pipe-bending die, the design of which directly impact the bending quality and the bending efficiency.
顶模是弯管全套模具的重要部件,它的设计直接影响弯管质量和弯管效率。
The top die is the important component of the complete set of pipe-bending die, the design of which directly impact the bending quality and the bending efficiency.
应用推荐