• 、采采煤方法顶板管理方法、重复采动的影响时间的影响以及开采范围的影响。

    The mining factors include mining thick, mining depth, mining ways, re-mining, time and mining length.

    youdao

  • 对于应力场覆岩破裂影响采矿因素工作面推进速度、采矿周期性顶板管理方法

    The mining procedures which have an influence on the stress field in the strata and the fracturing of the roof are the rate of daily face advance, the mining rhythm, and the nature of working.

    youdao

  • 本文分析了顶板原因提出顶板管理方法调整工艺,顶板锚网支护冒顶预测预报结果保证了采矿安全

    This paper analysed the cause of falling roof, raised some methods of roof management, such as adjusting mineral blast, bolt support and prediction of roof caving. It ensured safety in mining.

    youdao

  • 此外松散层地表程度、工作面推进速度采煤方法顶板管理方法开采程序时间因素对采场覆岩空间结构均一定影响

    Moreover, there are some other influencing factors such as: thick loose bed, surface mining degree, impel speed of working face, coal mining and roof manage methods, mining procedure and time.

    youdao

  • 此外松散层地表程度、工作面推进速度采煤方法顶板管理方法开采程序时间因素对采场覆岩空间结构均一定影响

    Moreover, there are some other influencing factors such as: thick loose bed, surface mining degree, impel speed of working face, coal mining and roof manage methods, mining procedure and time.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定