• 此外确定非线性负载规模位置也是所有维护故障排除修理计划重要组成部分之一。

    Besides, confirming the scale of nonlinear load and locating it is also an important part of all maintenance, fault removal and repair schemes.

    youdao

  • 在时间-费用关系非线性假设建立网络计划最低成本日程优化模型

    An optimization model to find the lowest budget schedule of network planning is established under the assumption that the time-cost relationship is nonlinear.

    youdao

  • 首先根据实际需要建立车间生产计划含需求约束非线性规划模型然后为求解方便通过引进约束将其转化线性规划模型。

    A nonlinear programming model of production planning with demand constraints is built up and then transformed into a linear programming model by adding constraints.

    youdao

  • 提出准确地描述准时化生产计划问题非线性无限规划模型

    To closely describe the just - in - time production planning problems a nonlinear semi - infinite programming model is proposed.

    youdao

  • 为了决定稳定周期性物流运作能力计划提出一般性整数非线性规划公式

    We present a general integer nonlinear programming formulation for determining an optimal stationary cyclic schedule of logistics capability.

    youdao

  • 当考虑发电机报价曲线的影响时,发电计划偏差优化问题一个高维离散约束条件复杂非线性最优化问题。

    Considering the generators bidding prices curves, the generation scheduling error optimization problem is high dimensional, disperse, complex constrained, non-liner problem.

    youdao

  • 克服现有方法求解复杂水火电力系统短期发电优化计划缺陷,提出一种新型优化算法对此类动态非线性约束优化问题进行求解。

    The goal of this research is to overcome the limitations of the existing method of solving the short-term generation optimal scheduling in hydrothermal power systems.

    youdao

  • 克服现有方法求解复杂水火电力系统短期发电优化计划缺陷,提出一种新型优化算法对此类动态非线性约束优化问题进行求解。

    The goal of this research is to overcome the limitations of the existing method of solving the short-term generation optimal scheduling in hydrothermal power systems.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定