本文应用最优控制理论,建立了非线性成本曲线的系统网络优化模型及计算公式。
Based on the optimal control theory, this paper has established the scheduling model in the system network and the formula of computation of the nonlinear cost-time curve.
学习曲线现象是引起非线性成本的又一个重要的原因,学习曲线特别适用于新产品或新的生产过程。
The phenomenon of learning curve is another major reason for nonlinear cost. Learning curve is especially fit for new products or new productive processes.
由于存在交易成本,偏离购买力平价可能呈非线性的均值回复特性。
As the presence of transactions costs, deviations from purchase power parity (PPP) may follow a nonlinear process that is mean reverting.
选择了几个典型非线性方程组,从收敛可靠性、计算成本和适用性等指标分析对比了不同算法。
Convergence reliability, computational cost and applicability of different algorithms were compared by testing several classical equations of nonlinear equations.
在时间-费用关系为非线性的假设下,建立求网络计划最低成本日程的优化模型。
An optimization model to find the lowest budget schedule of network planning is established under the assumption that the time-cost relationship is nonlinear.
针对可控提前期领域现有研究的不足,提出基于非线性提前期成本和存在顾客流失情形下,采用连续盘点策略的库存管理问题。
According to the defects of the researches dealt with controllable lead time, the authors present a continuous review inventory model with nonlinear lead time crashing cost and lost sale.
目前国内很多电视台都建立了非线性编辑网络系统,从而提高了节目制作效率,降低了节目制作成本。
Now, many television production nonlinear edit networks have been established in China, and they play an important role in raising efficiency and reducing costs.
而对有些历史数据完全的工作,即便数据之间成非线性关系,仍可预测其成本超支和完工百分比。
For activities with good historical records, it can be the case that a typically non-linear profile of cost expenditures and completion proportions can be estimated.
运用非线性理论研究企业环境成本与生产投入之间的动力学关系,预测环境成本与生产投入的发展趋势。
The dynamic relationship between the environmental cost and production input of enterprise was studied by non-linear theory to predict the development trend of environmental cost and production input.
该预失真器不仅对非线性改善效果明显,与同类预失真电路相比,还具有结构简单、体积小、成本低的优点。
Compared with other predistortion circuits of the same kind, it is simple, miniature, cost effective as well as giving the great linearity improvement.
探讨了工程成本与时间曲线为非线性时,成本与工期的优化问题。
The problems of optimizing cost and project time limit occur when the curve of the project cost and project time is nonlinear.
针对热电偶的非线性严重影响测温精度,本文提出一种利用EPROM器件进行非线性校正的新方法,并据此构成一种适用广、精度高、成本低的热电偶测温仪。
A new method of nonlinear correction based on EPROM is introduced. According to it, an instrument with high precision and low cost and wide use to measure temperature is constituted.
这一模型含有线性状态方程和神经网络非线性模型,提出了库存成本、供应成本、生产水平等在内的供应链目标函数。
The plant function that includes inventory cost, supply cost and production level was presented. And the optimizing result of the supply chains was computed by using genetic evolutionary programming.
这一模型含有线性状态方程和神经网络非线性模型,提出了库存成本、供应成本、生产水平等在内的供应链目标函数。
The plant function that includes inventory cost, supply cost and production level was presented. And the optimizing result of the supply chains was computed by using genetic evolutionary programming.
应用推荐