分析进行信息集成管理的必要性,建立集成化项目管理信息系统(IPMIS)的框架模型,并对该系统在新交通工程中的应用进行实证研究。
The frame model of Integrated project Management Information System (IPMIS) is established and the empirical study of its application in urban rail transit projects is carried out.
集成化的工作项管理会自动创建并追踪与团队进程与您所定义项目相伴随的私人工作项进展。
Integrated work item Management automatically creates and tracks progress of individual work items in accordance with the team process and project rules that you define.
本论文从集成化的角度,对项目集成风险管理理论和方法进行了研究。
It is very important to bring forward the theory and methods of integrated risk management and this paper studies on this problem.
而挣值管理作为一种新兴的项目集成化管理技术,能够实现产品研发进度、成本、质量和技术的综合管理与控制。
EVM, as a new project integrated management technique, is able to manage integratively and control product development progress, cost, quality and technique.
在分析了工程项目风险的基础上,提出了工程项目全寿命周期风险集成化管理。
Based on analysis the risk of project, life cycle integrated risk management of project was given.
在集成化管理中,合适的组织结构是高速公路建设项目集成化管理的支撑平台,信息技术是项目管理者进行姓名集成化管理的工具。
Due to integrated management, suitable organization is support platform to expressway construction project integrated management, however, information system is the tool of project management.
首先,全要素成本集成管理视工程项目管理的“主要要素”——成本、进度和质量为一个整体,奠定了项目全要素集成化管理的基础。
Firstly, cost, quality and schedule which are the main factors of engineering project management is integrated as a whole. The base of integrated management of total factors is established.
首先,全要素成本集成管理视工程项目管理的“主要要素”——成本、进度和质量为一个整体,奠定了项目全要素集成化管理的基础。
Firstly, cost, quality and schedule which are the main factors of engineering project management is integrated as a whole. The base of integrated management of total factors is established.
应用推荐