• 研究生产前沿参数方法包括确定性前沿面模型随机前沿面模型方法

    The so called parametric method of studying the production frontier including positive frontier and stochastic frontier models. Analyze and summarize the methods of positive models.

    youdao

  • 然而,由于传统DEA方法确定有效前沿面没有走出随机困境

    However, the traditional DEA methods do not get out of the trouble of randomness in determining the effective frontier.

    youdao

  • 然而,由于传统DEA方法确定有效前沿面没有走出随机困境

    However, the traditional DEA methods do not get out of the trouble of randomness in determining the effective frontier.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定