实际应用显示钢板桩的实施有利于减小渗流水头、降低堤身浸润线和出逸比降。
The effect of practice showed that the seepage prevention wall is beneficial to reducing the seepage water head, decreasing the seepage line inside dike and escape gradient.
白银公司三冶炼厂尾矿坝是一座险病坝,利用辐射井排水降低坝体浸润线的措施,保证了坝体的安全。
The tailings dam in the Third Baiyin Smeltery is a damaged dam. To secure the dam, radial collector well is applied to cause a drawdown of The phreatic line.
白银公司三冶炼厂尾矿坝是一座险病坝,利用辐射井排水降低坝体浸润线的措施,保证了坝体的安全。
The tailings dam in the Third Baiyin Smeltery is a damaged dam. To secure the dam, radial collector well is applied to cause a drawdown of The phreatic line.
应用推荐