现在我们将拖放四个附层顶部的躯干层在时间轴窗口。
We will now drag and drop the four appendage layers on top of the torso layer in the Timeline window.
将三根附墙杆起吊到适当高度,首先用销轴将杆与标准节一端连接,然后安装到地脚螺栓连接板上。
Lift the 3 shaft adhered to wall to the suitable height, firstly, connect the shaft with one end of the standard section, then install on the connection plate of foundation bolt.
全回转垂直式轴之梭头附梭壳开关器;
全回转垂直式轴之梭头附梭壳开关器;
应用推荐