在确定的间隔获得资产的快照或“基线”,例如在每个迭代或里程碑的末尾。
Take a snapshot or "baseline" of your assets at defined intervals, such as the end of each iteration or milestone.
即使你不在一个敏捷团队中,你还是可以在各个发布阶段,各个里程碑,或者通过固定的时间间隔来进行回顾,改进团队的工作方式。
Even if you aren't on an Agile team, you can hold retrospectives at releases, milestones, or at regular intervals to improve the way the team is working.
根据您的处理器和处理器运行的速度,您的里程(mileage)可能会不同,但这个API的确提供了一种方法来在jiffies滴答间隔下调度超时。
Depending upon your processor and the speed at which it operates, your mileage may vary, but the API does offer a way to schedule time-outs below the jiffies tick interval.
在里程碑版本之间会增加许多特性,间隔的时间也比较长,Geronimo团队常常提供最新的不稳定版本。
During periods of rapid feature additions or long periods between milestone builds, the Geronimo team often makes the latest unstable builds available.
在里程碑版本之间会增加许多特性,间隔的时间也比较长,Geronimo团队常常提供最新的不稳定版本。
During periods of rapid feature additions or long periods between milestone builds, the Geronimo team often makes the latest unstable builds available.
应用推荐