• 工程最大难点在于隧洞勘察、设计施工

    The most complicated part of the project belongs to the design and construction of these long tunnels at great depths.

    youdao

  • 结合工程实例,利用水气数学模型计算隧洞通气量。

    An air water two phase flow model for air demand computation for tunnels is developed in this paper.

    youdao

  • 地应力地下水问题隧洞衬砌设计施工具有重大影响

    In-situ stress and groundwater have important influences upon the design and construction of the lining for deep and long tunnels.

    youdao

  • 巴基斯坦杜伯华水电站工程水头隧洞引水水电站工程。

    Duber Khwar Hydropower Project is a diversion type power station characterized by high water head and long tunnel.

    youdao

  • 实践证明,断面隧洞TBM施工段设置中间施工支洞,一个成功经验

    On the whole, this is a good experience for the construction of the tunnel with large cross-section and super length by TBM.

    youdao

  • 第一工程方案关键技术就是如何开凿深隧洞,掘进机采用使得问题得到解决。

    The key technology of the first stage project is how to dig tunnels and this is to be solved by adopting excavators.

    youdao

  • 第一工程方案关键技术就是如何开凿深隧洞,掘进机采用使得问题得到解决。

    The key technology of the first stage project is how to dig tunnels and this is to be solved by adopting excavators.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定