• 如果GC由于碎片问题而执行压缩,那么增加大小可能有助于缓解压缩导致时暂停问题

    If the GC is performing compaction phases due to fragmentation issues, increasing the heap size might help alleviate the long pauses due to compaction.

    youdao

  • 例如可能非常暂停大于500MB阶段兴趣。

    For example, you may only be interested in the really long pauses or in periods when the heap is larger than 500mb.

    youdao

  • 沸水反应中包含数千空管即燃料,它3.6福岛第一核电厂中的燃料棒合金制成的。

    A BWR contains thousands of thin, straw-like tubes 12 feet in length, known as fuel rods, that in the case of Fukushima are made of a zirconium alloy.

    youdao

  • 操作方法适用于两种类型,存活期对象(临时的nurseryheap存活期的对象(永久tenured heap)。

    With this method of operation there are two heap areas, one for short-lived objects (nursery heap) and one for longer-lived objects (tenured heap).

    youdao

  • Monk ' s Mound民族所建造最大的一个Mound,几乎有100英尺900英尺

    Monk's mound was the largest mound ever constructed by mound-building people and was nearly 100 feet tall and 900 feet long.

    youdao

  • 不幸航天飞船留下问题,50卫星之路啊,恐怕我们不得不相当时间内容忍这种状况

    Unfortunately, there is a whole legacy of spacecraft - 50 years of satellites - and we are going to have to put up with this situation for quite some time, I'm afraid.

    youdao

  • 然而同样时间里反应再次意外罢工,令加拿大美国卫生部门官员们不得不匆匆寻找同位素替代来源

    But the reactor's second unscheduled shutdown in as many years left health officials in Canada and the United States scrambling to find alternative sources of the isotope.

    youdao

  • 结果表明冷轧处理织物退浆率较高,毛效织物强力下降多,周期

    Results show that cold pad-batch process can impart the fabric good size removal and capillary effect, but large strength reduction and long cycle.

    youdao

  • 当时滑条一千英尺斜坡,随着一落到了另一个雪坡。

    At the end of the slope he fell a thousand feet, and came down in the midst of a cloud of snow upon a snow-slope even steeper than the one above.

    youdao

  • 研究设计周期(18个月)泄漏平衡循环秦山二期扩建工程制定了一具有工程实用价值的燃料管理方案

    Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    youdao

  • 研究设计周期(18个月)泄漏平衡循环秦山二期扩建工程制定了一具有工程实用价值的燃料管理方案

    Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定