如果GC由于碎片问题而执行压缩,那么增加堆大小可能有助于缓解压缩导致的长时暂停问题。
If the GC is performing compaction phases due to fragmentation issues, increasing the heap size might help alleviate the long pauses due to compaction.
例如,您可能只对非常长的暂停或堆大于500MB的阶段感兴趣。
For example, you may only be interested in the really long pauses or in periods when the heap is larger than 500mb.
沸水反应堆中包含数千根细长的中空管即燃料棒,它长3.6米,福岛第一核电厂中的燃料棒是锆合金制成的。
A BWR contains thousands of thin, straw-like tubes 12 feet in length, known as fuel rods, that in the case of Fukushima are made of a zirconium alloy.
该操作方法适用于两种堆类型,一是存活期短的对象(临时的堆,nurseryheap)和存活期长的对象(永久堆,tenured heap)。
With this method of operation there are two heap areas, one for short-lived objects (nursery heap) and one for longer-lived objects (tenured heap).
Monk ' s Mound是丘堆民族所建造的最大的一个Mound,几乎有100英尺高900英尺长。
Monk's mound was the largest mound ever constructed by mound-building people and was nearly 100 feet tall and 900 feet long.
不幸的是,航天飞船留下了一大堆问题,50年的卫星之路啊,恐怕我们将不得不在相当长的一段时间内容忍这种状况。
Unfortunately, there is a whole legacy of spacecraft - 50 years of satellites - and we are going to have to put up with this situation for quite some time, I'm afraid.
然而,在同样长的时间里反应堆再次意外罢工,令加拿大和美国的卫生部门官员们不得不匆匆寻找同位素的替代来源。
But the reactor's second unscheduled shutdown in as many years left health officials in Canada and the United States scrambling to find alternative sources of the isotope.
结果表明,冷轧堆处理的织物退浆率较高,毛效好,但织物强力下降多,且周期长;
Results show that cold pad-batch process can impart the fabric good size removal and capillary effect, but large strength reduction and long cycle.
他当时滑下了一条一千英尺长的斜坡,随着一堆雪落到了另一个更陡的雪坡。
At the end of the slope he fell a thousand feet, and came down in the midst of a cloud of snow upon a snow-slope even steeper than the one above.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
应用推荐