• 胜利油田研制海底电缆铺设装置过程中,发生升压变压器合闸过电流跳闸问题

    In the process of developing submarine cable laying installation for Shengli Oil Field, a certain problem has occurred with overcurrent tripping during switching on of step up transformer.

    youdao

  • 产品适用范围包括土壤中直接埋设、电缆安装浸没水中埋设海洋泥浆中和自由流动海水装置铺设外加电流阴极保护系统

    This product scope including soil directly bury cable tray installed in the submerged in water and Marine mud buried in the free flow of water device laid impressed current cathodic protection system.

    youdao

  • 产品适用范围包括土壤中直接埋设、电缆安装浸没水中埋设海洋泥浆中和自由流动海水装置铺设外加电流阴极保护系统

    This product scope including soil directly bury cable tray installed in the submerged in water and Marine mud buried in the free flow of water device laid impressed current cathodic protection system.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定