这些项目是由国际钻井承包商协会或国际井控论坛等组织完成的。
These programs are done by organizations such as the International Association of Drilling Contractors or International Well Control Forum.
Simmons本计划完成他的经济学博士学位后就到他父亲在美国犹他州的银行工作,而他在完成了大半学分后竟然(这是译者自己加的观点,不可取)中途辍学,之后他为加利福尼亚州一新建近海石油钻井的 工人们(哪里有工人??)
He was two-thirds of the way through a doctorate in economics and had planned to join his father’s bank in Utah when he finished.
研究人员说,他们分析的钻井是已经采用水力压裂法完成的,但是,岩层破裂是否可能正在导致污染,这个问题还要更多的过程研究才可以理解。
The researchers said the Wells they analyzed had been hydraulically fractured, but that more study of that process was needed to understand whether fracturing might be causing the contamination.
Halliburton Co .负责了钻井平台的固井工作,当勘探性开采完成而生产还没有开始的时候,固井是稳定油井的一个关键步骤。
Halliburton Co. handled the rig's cementing work, a key component in stabilizing a well when exploration drilling is finished but production hasn't started.
防腐蚀处理,如油漆润色时,应完成的机械损伤,如钻井或锯发生。
Anti-corrosion treatments such as paint touch up shall be completed when mechanical damage such as drilling or sawing occurs.
2004年,大港油田完成6口水平井的钻井、试油、投产任务。
In 2004, Dagang oilfield has completed 6 Wells of drilling, oil production testing and starting-up.
该井的完成,创同类型水平井钻井周期、纯钻时间、平均机械钻速的国内好成绩。
It sets good records on drilling cycle, net drilling time and average ROP in the same kind of horizontal Wells.
在完成钻井作业后,桩靴较大的自升式钻井船在拔桩中会对筒型基础平台的地基产生一定的影响。
After drilling, the jackup drilling rig with biggish pile shoes will produce a certain influence on foundation of bucket foundation platform during pile extracting.
目前,迪那3三维地震项目测量工作已完成70%以上,钻井超过1000口,计划10月1日开炮。
Currently, Dina 3-d seismic survey work has been completed the project more than 70% over 1000 drilling plans October 1 fire.
它可以完成许多智能钻井的工作。
It can complete a lot of intelligent work for the drilling well.
标准石油和其它公司拥有完成任务的每个生产水平-钻井,精炼,运输和销售。
Standard Oil and other companies that it owned performed every level of production — from drilling to refining to transporting and selling.
熟练的钻井队人员在一分钟或者两分钟内就完成上述所有这些步骤。
A skilled rig crew can physically accomplish all of those steps in a minute or two.
南方海相地区是中国石化资源战略接替探区,已完成了15口井,目前正钻井9口。
The marine sedimentation area of south China is the succeeding exploration area of Sinopec where 15 wells have been completed and 9 wells are under drilling.
在此基础上,针对一种具体的钻井工艺完成了海洋修井机用于开窗侧钻作业的配套方案研究,为海洋小井眼开窗侧钻作业提供了一种新的途径。
On the base of that, the matching construction of the ocean workover rig for side tracking was discussed. This provided a new way for the slim hole drilling.
试油勘探是石油和天然气勘探中,继地震勘探和井位研究部署、钻井勘探、测井分析完成后,进行油气层验证及油气发现的最后一个环节。
Well-testing exploration is the last step of discovering and verifying oil and gas in petroleum and natural gas exploration, following the seismic exploration, well locating, and logging-analysis.
本文设计的物探钻具性能测试系统可完成对钻井过程中的空气压力、空气流量、转速、钻压、钻井深度等参数的测试。
The designed testing system in the paper can complete these tests as to air pressure, airflow rate, rotary speed, bit weight and drilling depth in the process of well drilling.
钻井作业完成后,井场搬迁时要对这些设施进行移运及处理,除了移运费用,对于道路状况严苛的井场,有对设备的顺利移运提出了问题。
After the drilling operation, we need to move and treat these facilities, excepting the machinery handling rate, for the harsh road condition well site, it also raise questions to the smooth movement.
他说:“目前,关于制造该钻井船的准备工作基本完成,设计方案也已接近尾声,最后的一步就是要寻找一个好的发展前景和适合的用户。”
He says: "all the engineering is basically done and the Arctic rig concept is close to completion, so it is really only a matter of finding the right prospect and the right client."
江苏油田已成功完成了40余口套管内侧钻井,所完成的侧钻井全部中靶,最小靶心距不到1米。
Jiangsu Oilfield has already finished more than 40 side tracking Wells successfully. All the side tracking Wells finished are within the range of target district.
在完成钻井作业后,桩靴较大的自升式钻井船在拔桩中会对筒型基础平台的地基产生一定的影响。
Simulation of influence of biggish pile shoe pulling out on foundation of bucket foundation platform with finite element program;
在完成钻井作业后,桩靴较大的自升式钻井船在拔桩中会对筒型基础平台的地基产生一定的影响。
Simulation of influence of biggish pile shoe pulling out on foundation of bucket foundation platform with finite element program;
应用推荐