• 上海某地铁盾构隧道穿越上海第三大河白莲泾,白莲泾防汛基础钢筋混凝土结构、隧道内,盾构通过前须处理基。

    The foundations of the flood control walls of Bailianjing River are of square piles made of reinforced concrete, which stretch into the tunneling scope.

    youdao

  • 高坡土墙施工采用人工挖孔,并结合逆作法钢筋混凝土墙板法,具有无需土大开挖、无需支撑、施工安全和节约基建投资等优点。

    In the construction of retaining wall with steep slope grade, manual hole digging piles are adopted in combination with reverse working for ramming reinforced concrete wall panel.

    youdao

  • 高坡土墙施工采用人工挖孔,并结合逆作法钢筋混凝土墙板法,具有无需土大开挖、无需支撑、施工安全和节约基建投资等优点。

    In the construction of retaining wall with steep slope grade, manual hole digging piles are adopted in combination with reverse working for ramming reinforced concrete wall panel.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定