重点讨论了水电厂(站)子系统的硬件体系结构和软件体系结构以及实施中的有关问题。
Specifically has discussed the hardware system structure and software system structure of hydropower plant subsystem. And the problems concerned. During the implementation.
万安资源丰富、电力充沛,国家重点工程装机50万千瓦的国电万安水电厂位于县城南面;
Wan'an is rich in natural resources. The national key project Wan'an 500,000kw Hydroelectric power station lies to the south of downtown, Wan'an is a beautiful scenic spot.
万安资源丰富、电力充沛,国家重点工程装机50万千瓦的国电万安水电厂位于县城南面;
Wan'an is rich in natural resources. The national key project Wan'an 500,000kw Hydroelectric power station lies to the south of downtown, Wan'an is a beautiful scenic spot.
应用推荐