• 大渡河瀑布沟水电站(3300MW)国家十五计划重点工程项目

    Pubugou Hydropower Station (3300 MW) on Dadu River is a key project fixed in the national 10th Five-Year Plan.

    youdao

  • 上海假日酒店、上海地铁工程、上海浦东机场、上海科技馆重点工程项目配套

    Holidayinn hotel in Shanghai, the Shanghai subway project, the Shanghai Pudong Airport, Shanghai Science and Technology Museum, and other key projects supporting;

    youdao

  • 基于重点工程项目介绍了一种高速数据并行处理系统,并详细说明了DS P信号处理程序操作流程

    Based on one key project, a high-speed digital parallel analyzing system is introduced. The flow of operation of the signal processing program in DSP is defined in detail.

    youdao

  • 基于重点工程项目介绍了一种高速数据并行处理系统,并详细说明了DS P信号处理程序操作流程

    Based on one key project, a high-speed digital parallel analyzing system is introduced. The flow of operation of the signal processing program in DSP is defined in detail.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定