• 本文介绍了铜绿山矿全尾砂高水固化充填试验工艺,以及利用技术实现底柱充填接项的试验研究

    Testing and study on utilizing this technology for tightened filling in sill stope in Tonglushan Mine are presented in this paper.

    youdao

  • 武山铜矿采用上向水平分层进路水砂充填法回采,采多次发生冒顶、片帮。

    The South ore-bearing zone of Wushan copper mine is mined with ascending horizontal slicing hydraulic fill crosscut mining system. Roof falling and rib spalling occurred in any times.

    youdao

  • 武山铜矿采用上向水平分层进路水砂充填法回采,采多次发生冒顶、片帮。

    The South ore-bearing zone of Wushan copper mine is mined with ascending horizontal slicing hydraulic fill crosscut mining system. Roof falling and rib spalling occurred in any times.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定