总结出了某矿脉采矿方法优化的主要依据。
Besides, the bases of the optimization of mining method for a certain ore vein are summarized.
通过对山东王村铝土矿采矿方法优化的介绍,提出了一种新的采矿方法——人工顶柱无底柱长壁式崩落法。
Through the detail introduction on optimization of raining method in Shandong Wangcun Bauxite Mine, this paper puts forward a new mining method——longwall caving with artificial roof pillar.
依据东大山铁矿的矿体形态及所采用的采矿方法,浅析了中深孔崩矿参数的设计与优化途径。
In accordance with the orebody shapes of Dongdashan iron mine and the adopted mining method, the ways of design and optimization for medium and deep caving parameters were given.
本文主要论述了倾斜极薄岩金矿脉采矿方法的优化途径。
The approaches to optimization of mining method for inclined and extra-narrow gold ore vein are described in this article.
提出用遗传规划优化地下采矿方法巷道布置的新方法。
This paper presents a new approach to obtain the optimal opening structure of underground mining method by genetic programming.
在此基础上,结合矿山的品位分布和采矿方法,提出整体优化和部分优化的思路,并通过计算机软件系统实现。
Base on this, Offer the idea of total and part of the mine optimization consider of the grade distribution and mining methods, then implement it by computer software system.
经过多年的矿床研究和实践,形成了一套比较适用的采矿方法,本文介绍近几年采矿技术参数的优化及应用成果。
Through many years study and practice, suitable mining method is formed. This paper introduced the optimization and applied effect of mining technical parameter.
在会东铅锌矿的采矿方法试验研究中,采用模糊数学方法进行采矿方法的优化选择。
During the experimental study on mining method in Huidong Lead-Zinc Mine, the selection of mining method is optimized through the approach of fuzzy mathematics.
在会东铅锌矿的采矿方法试验研究中,采用模糊数学方法进行采矿方法的优化选择。
During the experimental study on mining method in Huidong Lead-Zinc Mine, the selection of mining method is optimized through the approach of fuzzy mathematics.
应用推荐