图10:用每个迭代最后的重要的交付日期对整个构建阶段分成三个六周周期的综合时间表进行采样。
Figure 10: Sample master schedule that has the overall Construction phase divided into three six-week periods, with important delivery dates at the end of each iteration.
图10:用每个迭代最后的重要的交付日期对整个构建阶段分成三个六周周期的综合时间表进行采样。
Figure 10: Sample master schedule that has the overall Construction phase divided into three six-week periods, with important delivery dates at the end of each iteration.