• 矿井采掘计划的编制典型不良结构复杂技术经济问题

    The draft of coal mine excavation plan is typically an unhealthy structural and complex tech economic problem.

    youdao

  • 编制采掘计划处理采掘关系决策手段,也是其首要基础性工作

    Weaving excavate and grub supersedure plan is means of dealing with connection of excavate and grub in mine production , and is chief and basal work.

    youdao

  • 本文介绍了完成采掘计划几点意见,可供从事矿山计划管理现场管理人员参考

    This paper introduced several views of fulfilling excavation plan, which can be a reference for mine plan and field management people.

    youdao

  • 针对矿井采掘计划管理复杂性采用J2EE平台开发了矿井采掘计划管理信息系统

    In view of complexity of coal mining plan management, a management information system of coal mining plan is developed with J2EE platform.

    youdao

  • 本文通过研究采掘领域专家知识构造了采掘计划规则设计了基于产生规则推理程序

    Through studying the expert knowledge of mining scheduling, this paper constructed a mining rule base for mining scheduling, and designed a ratiocinate program based on production rules.

    youdao

  • 我们世界银行各国合作鼓励他们签署采掘透明度行动计划》(EITI)的原则

    At the World Bank, we are working with countries to encourage them to sign on to the Extractive Industry Transparency Initiative (EITI) principles.

    youdao

  • 推理过程中通过规则搜索匹配自动生成合理采掘接替计划

    The ratiocinate program generate automatically a reasonable mining scheduling by searching and matching rules.

    youdao

  • 针对露天矿采掘进度计划优化编制问题,建立了个数学模型,同时较充分地考虑了作业条件下的模型建立和问题处理。

    An optimized mining plan model was presented for opencast mines. During the development of the model, mining construction was given full consideration.

    youdao

  • 美国欧洲采掘反对官方强制透明计划他们辩称界定一个采矿项目或者说的地域范围很困难的事情。

    The extractive industry in the us and europe is fighting the move toward mandatorydisclosure, arguing that it is difficult to define a mineral "project" or its geographicboundaries.

    youdao

  • 综合应用进化算法计算机技术,分阶段采掘进度计划实现优化

    Evolutionary algorithm and computer technology are used in combination in optimizing the mining scheduling in two phases.

    youdao

  • 编制采掘接替计划处理采掘关系决策手段也是首要基础性工作

    Weaving excavate and grub supersedure plan is means of dealing with connection of excavate and grub in mine production, and is chief and basal work.

    youdao

  • 采掘进度计划矿山建设均衡生产具有指导作用。

    Open pit mining production scheduling is of guidance significance to the mine construction and balanced production.

    youdao

  • 采掘进度计划矿山建设均衡生产具有指导作用。

    Open pit mining production scheduling is of guidance significance to the mine construction and balanced production.