• 兰州市小西湖黄河大桥为例,说明部分斜拉桥斜拉索设计一些主要特点

    The design characteristics of stay cables of partially cable stayed bridge referring to Xiaoxihu Yellow River Bridge in Lanzhou are presented.

    youdao

  • 斜拉桥由于因素影响,致使部分斜拉桥运营段时间需要全部部分更换斜拉索。

    Affected by various factors, the whole or part of the stay cables of some cable-stayed Bridges have to be replaced after a period of operation.

    youdao

  • 通过部分斜拉桥拉索疲劳试验结果验证了本文介绍疲劳强度设计方法正确性

    At last, correctness of the design methods about fatigue strength via the fatigue experimental results of two partially cable-stayed Bridges are verified.

    youdao

  • 厦门同安银湖大桥国内第一座使用环氧全涂平行钢绞线斜拉索的预应力混凝土部分斜拉桥固结体系。

    Xiamen Yinhu bridge is a partially cable-stayed prestressed concrete bridge, whose pier, tower and beam are consolidated together.

    youdao

  • 斜拉桥桥跨结构重量和桥上活绝大部分或全部通过斜拉索传递上。

    Most of the load is transfer to the tower of the bridge.

    youdao

  • 运用数值风洞斜拉桥部分周围场进行数值模拟,得到斜拉桥周围流场速度分布斜拉桥表面的压强系数。

    Through the numerical analysis of the flow phenomenon around the cable-stayed bridge by means of numerical wind tunnel, the speed distribution of the f.

    youdao

  • 效应斜拉桥地震响应影响明显大于部分相干效应影响;

    Travelling effect has more significant effect on the seismic responses of cable-stayed bridge than incoherence effect;

    youdao

  • 斜拉桥施工过程受力计算斜拉桥设计重要组成部分

    Construction procedure calculations are important parts of the design of cable-stayed Bridges.

    youdao

  • 斜拉桥上部结构包括三个主要部分:索主梁斜拉索。

    The superstructures of cable-stayed bridge mainly include three parts:tower, main girder and stay cable.

    youdao

  • 斜拉斜拉桥重要组成部分承担斜拉桥施工阶段成桥后正常运营阶段的部分荷载。

    The cable is one of the key parts of cable-stayed bridge. It takes on most part of the load in constructing and constructed of cable-stayed bridge.

    youdao

  • 这种方法是以组成斜拉桥部分构件应力几何尺寸斜拉的无应力索钢梁的无应力线形来主导施工控制

    This method mainly control the unstress geometry size of each components of the whole cable-stayed bridge such as the unstress length of cable, unstress geometry of steel girder.

    youdao

  • 这种方法是以组成斜拉桥部分构件应力几何尺寸斜拉的无应力索钢梁的无应力线形来主导施工控制

    This method mainly control the unstress geometry size of each components of the whole cable-stayed bridge such as the unstress length of cable, unstress geometry of steel girder.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定