两段程序都使用递减的计数器生成元素的值。
Both programs decremented a counter to generate the element values.
算例分析表明:最优价格是初始库存的递减函数,是潜在购买率和销售时间段的递增函数;
Simulation shows that the optimal price is a decreasing function of initial inventory and an increasing function of sale period and potential buying probability;
第四段:一般有机台还有第五,第六段,这段的成型速度和压力相同前,都存在两段一个递减过程。其作用都是起到一个再次充满的作用。
Step4 section: Some injection machines have step5, step6 which are same as former molding speed and pressure this step should diminish and inject once more.
结果表明,在基坑开挖过程中,基坑壁附近的土体应力状态变化显著;锚杆锚固段应力呈非线性递减分布;
The result indicates that when the foundation pit is excavated, the soil stress state near the foundation pit wall changes obviously;
结果表明,在基坑开挖过程中,基坑壁附近的土体应力状态变化显著;锚杆锚固段应力呈非线性递减分布;
The result indicates that when the foundation pit is excavated, the soil stress state near the foundation pit wall changes obviously;
应用推荐