本文引入决策群体关于供选方案的优先数。
In this paper, a priority number of the alternative for the decision group is introduce.
它主要研究如何集结模糊信息,确定待选方案的优先权重。
Its major research object is how to gather fuzzy information and get the priority heavy of alternative programs.
目前,隧道方案已经成为长距离油气管道通过山区的一个主选方案。
At present, a tunnel scheme has become a primary option of a long-distance oil-gas pipeline through mountains.
最后设计出相应的供应管理策略进行模拟以评价各比选方案的有效性。
Finally, supply management strategies were designed and simulated to assess the effects of alternative scenarios.
医院战略策略的确定是一个提出策略备选方案、选优、实施、改进的过程。
The establishment of hospital strategy is a process of putting forward alternative options, optimizing, implementing, and improving.
采用基于地理信息系统的图形叠置法对线路比选方案的噪声影响情况进行评价。
Graph overlay method is used in route alignment noise impact assessment to provide a basis for route alignment optimal selection.
本文引进群体决策的决策个体和决策群体关于供选方案对的偏比度,以及偏比泛函概念。
In this paper, the preference-ratio measure relative to a pair of alternatives and the preference-ratio functional are introduced, respectively, for an individual and a group in group decision making.
应用多目标规划和模糊综合评价方法对晋中榆社县云竹河流域大型土地整理工程进行规划,得出三个供选方案。
In this paper, the comprehensive exploitation and utilization programming of Yunzhu River Valley is carried out using target programming model and three plans are determined for selects.
针对层次分析法的不足,本文提出用五个三角模糊标度数来代替语言变量,以说明待选方案对评价准则的相对影响程度。
In view of the drawback of AHP, this paper advances to substitute five triangle fuzzy scale Numbers for linguistic variables, in order to evaluate the appraisal criteria's influence on alternative.
这里有大量的机会所以决定选一个可以让你成为更出色的设计师的方案,否则你就不会赢。
There are a ton of opportunities, so make sure you pick a project that will make you a better designer even if you don't win.
你永远也选不到、做不出完美的方案。
无论你选用哪种的方案,选一个领头的。
超级简单的花椰菜与杏仁—一个伟大的供煮、蒸二者选一的方案,或用微波加热花椰菜,而味道太…棒了。
Super simple broccoli with almonds – a great alternative to boiling, steaming or microwaving broccoli and it's soooo good.
他说在2012年大选以后才可能有长期的方案。
He said a more long-lasting solution would have to wait until after the election in 2012.
方案比选是桥梁设计过程中的一个极其重要的内容。
The plan compared to elects is in a bridge design process extremely important content.
该区地质情况复杂,断裂构造十分发育,因此地质勘探对桥址方案的比选显得尤为重要。
As the area has complex geological conditions and well-developed faults, the selection and comparison of schemes for bridge sites through geological exploration seem especially important.
经模拟选优,确定了不同目标产量下的最佳施肥方案。
The best application fertilizer scheme were established according from different yield target after simulated select.
通过对原输水工程初步设计方案的分析,对多个方案进行了比选,并确定了输水方案。
Through analyzing the preliminary design scheme of original water conveyance project, this paper makes comparison and selection of several schemes, and determines the water conveyance scheme.
其三是可以提供多项服务,便于钻井设计方案的选优和对录井技术人员进行训练和培训。
The third is that it can provide more services to optimize the drilling plan and train the mud logging technicians.
经方案比选,采用钢花管对洞顶及两侧部分的地表和隧道地基与拱脚部位进行注浆加固。
Through comparing several schemes, steel tube-grouting was adopted to reinforce the wall rock and the foundation of the tunnel.
龙怀水库坝体存在渗漏问题,根据工程地质条件通过方案比选,采用塑性砼防渗墙防渗,防渗效果较好。
According to the seepage problems of Longhuai dam body and its geological conditions, the plastic concrete cutoff wall seepage was adopted to obtain better effect after scheme comparison.
结合工程实际,简要介绍新、旧桥梁横向连接的设计方案比选以及设计要点。
Based on the practice, it introduces the design plan and focuses on the transverse joint between newly-built and existing Bridges.
从收集资料、预测交通量、方案比选、环境影响评价等多方面阐述了公路可行性研究工作中应注意的问题。
From collecting materials, forecasting traffic volume, alternate plan and environmental impact evaluation, the paper discussed some problem in highway feasibility research work.
介绍了多方案的研究、比选及专家评审的经过,最后确定采用碎石道床方案。
This paper discusses how to select the competitive schemes and experts opinions, argues that the adoption of the ballast project is a best choice.
对地下水位以下较深的饱和粉土地基处理,经过方案比选,采用明沟降水,并进行部分换填加基坑内强夯的处理方法。
Through the comparison of the construction schemes the dewatering with open drain, replacement and dynamic compaction are used for the treatment of saturated silt ground under groundwater.
公路建设的方案比选是其前期工作中的一项很重要的内容。
Scheme comparison of the highway construction is an important content in the early stage of working.
通过对钻孔灌注桩和FRANKI桩两种地基处理方案的比选,最终确定采用FRANKI桩地基处理方案。
After scheme comparison between cast in-place concrete pile method and FRANKI pile method, the FRANKI pile method has been confirmed finally.
展会方案制定,包括选主题,选会址,时间安排,活动安排,区域规划,市场调查,推广方案,赞助,供应商,售票方式,志愿者招募,会场布置,以及收尾。
Make the event plan, including event theme, venue selection, time arrangement, marketing, sponsorship, supplier, volunteer, on-site adjustment, and close-down.
将此模型应用于桥型方案选优评价之中。
The model was applied in optimal evaluation for bridge type scheme.
将此模型应用于桥型方案选优评价之中。
The model was applied in optimal evaluation for bridge type scheme.
应用推荐