选择所有的项目,单击Finish。
您必须为它的子计划,将其拖至新的迭代中,或者您可以一次选择所有的项目。
You must drag it to the new sprint for its child tasks to move to the new sprint with it, or you can select all of the items at once.
最好同时选择所有的模型项目,以对它们都执行share操作。
It is best to select all of the model projects at the same time and to perform the share operation on all of them at once.
别想着一下子就做到这个单子上所有的事情,你可以选择一些喜欢的项目去尝试。
Instead of trying to tackle everything on this list at once, choose a few things that appeal to you, and give them a try.
同步化意味着所有的项目必须按照相同的间隔进行传播;不同步化意味着项目可以选择它们自己的计时方式。
Synchronized means that all projects must propagate on the same intervals; unsynchronized means that projects choose their own timing.
简单的界面能够容纳所有的主窗口中的功能,允许用户选择和只有一对夫妇的点击锁定的项目。
The simple interface accommodates all the functions inside the main window and allows users to select and lock items with only a couple of clicks.
在颜色面板中,为所有的组幻灯片选择一个边框颜色。这个颜色在项目运行时不会显示。
From the color palette, select a color for the border of all the slides in the group. This color is not displayed when the project is run.
重复步骤2但这次选择文件夹“程序2”…对于所有的项目做同样的事情。
Repeat step 2 but this time select the folder "Application 2"... do the same for all projects.
重复步骤2但这次选择文件夹“程序2”…对于所有的项目做同样的事情。
Repeat step 2 but this time select the folder "Application 2"... do the same for all projects.
应用推荐