这个指标起初只是为了帮助团队更好地决定下一次迭代的计划工作量。
It was originally created to help a team decide how much they can plan for the next iteration.
开发迭代产生应用程序的可部署工作版本(应用程序的工作构建)后,业务分析人员可以通过跟踪关键性能指标(Key Performance Indicator,KPI)来监视系统的实时性能。
After a development iteration produces a deployable, working build of the application, business analysts can monitor the live performance of the system by tracking key performance indicators (KPIs).
其一种方法是迭代式的增加缓存大小并在峰值稳定状态负载下运行应用程序,直到PMI指标不再报告任何缓存丢弃操作。
The other option is to iteratively increase the cache size and run the application under peak steady state load until the PMI metrics report no more cache discards.
XP/Scrum团队里面经典的度量指标自然是开发速率(Velocity),或者说团队在上一次迭代里面完成了多少开发工作?
The classic metric for an XP/Scrum Team is of course velocity or how much work did the team complete in the last iteration?
由于预取距离不是一个明确的指标,为了讨论,我们定义一个新的术语,预取调度距离(PSD),它是由迭代的次数反映。
Since prefetch distance is not a well-defined metric, for this discussion, we define a new term, prefetch scheduling distance (PSD), which is represented by the number of iterations.
并给出确定指标权重的循环迭代计算公式与方法。
And give iterating and methods of determining indexes weight.
对于指标权重的确定,本文采用了基于主观赋权的集值迭代法。
The paper adopts the method of extreme value iteration based on subjective empowers for determining weight of indicators.
边坡稳定一阶可靠度分析的常用方法是验算点法,该方法在求解可靠指标时需要进行迭代计算。
Design point method, in which the iterative calculation is needed to computer the reliability index, is usually used for first-order reliability analysis of slope.
针对一次二阶矩法可靠度指标分析中验算点的计算问题,提出一种新的修正迭代算法。
A new iterative algorithm is presented for seeking the design point in the FOSM reliability index analysis.
其中,可靠指标的迭代求解方法是有限步长迭代法。
The method of reliability analysis was a limit step length iteration method(LSLIM).
其中,可靠指标的迭代求解方法是有限步长迭代法。
The method of reliability analysis was a limit step length iteration method(LSLIM).
应用推荐