采用连续加载、卸载方式,开展了轮胎准静态负荷试验。
Quasi-static loading experiments of tire are conducted with continuous loading and unloading.
完善了控制效果,增加了超压低压脱网控制、连续加载控制、连续卸载控制等功能。
Consummating the purposes for control, enhancing offline control for over-press and low-press, continual loading control and unloading control.
为了能对活塞环进行连续加载,采用弹簧加载装置,从中找出活塞环所能承受的极限载荷。
Adopting spring load device for continuing to load, find the ultimate load that the piston ring be endured.
利用自行研制的UCT - 1型蠕变试验装置,采用单调连续加载和分级加载方式,对南阳大理岩进行了单轴压缩蠕变试验研究。
By continuously loading and multi-stage loading, the creep test on Nanyang marble is performed by using the self-developed UCT-1 apparatus of creep test.
利用自行研制的UCT - 1型蠕变试验装置,采用单调连续加载和分级加载方式,对南阳大理岩进行了单轴压缩蠕变试验研究。
By continuously loading and multi-stage loading, the creep test on Nanyang marble is performed by using the self-developed UCT-1 apparatus of creep test.
应用推荐