当你评估一个计划、模型、文档或一些其他不可执行的表现物的美好和出色之处时,你只是在推测项目质量和进度。
As long as you are assessing the beauty or goodness of a plan, model, document, or some other nonexecutable representation, you are only speculating about quality and progress.
Sinatra 1.0版的开发进度缓慢的原因,是其采用了语义版本模型
在您按进度努力交付可靠的应用程序时,并发模型之间存在确实的不同。
There are real differences between the concurrency models when you're working to deliver reliable applications on schedule.
在迭代测试中,我们因此根据处于不同环境中的客户来同时确定商业使用模型检查和系统测试活动的时间进度。
In iterative testing, we therefore schedule both business usage model reviews and system testing activities with customers whose environments differ.
RationalRose模型的导入将开始,进度条将向您展示移植的状态。
The import of the Rational Rose model will start, and a progress bar will show you the status of the migration.
论文通过实例说明了该模型可以有效地缩短项目周期,为项目进度管理提供了新的思路。
By cases, this paper explains that this model can effectively shorten the project cycle and provide project schedule management with new thinkings.
结果表明,考虑进度风险因素的优化模型是科学合理的。
Case study shows that the resource reallocation model considering schedule risk factors is reasonable.
提出了基于模糊网络进度计划的施工索赔工期分析,建立计算模型并使之程序化。
Give the analysis of construction claims construction period based on Fuzzy-network progress plan, and make it as a calculate model program.
在实验室中进行模型实验,虽有直观、形象等优点,但通常存在费用高、进度慢等缺点。
The experimentation has the strongpoint of idiographic and visual, but it has the disadvantage of long period and high charge.
针对这个模型设计了基于猴群算法的模糊模拟求解方法,并对某加气站项目进度进行了数值模拟。
A monkey algorithm based simulation method to the model was designed, and used to a filling station project schedule numerical simulation.
因此,水闸枢纽工程施工进度预警模型研究具有很强的现实意义和一定的理论价值。
Therefore, it has strong realistic meaning and a certain theory value to study on construction-schedule early-warning model of waterlocks key project.
如果能提高三维模型的开发效率,将会加快整个虚拟实验开发的进度。
If the development efficiency of the three-dimensional model can be improved, the progress of the development of virtual experiment will be accelerated.
通过理论运用的实证分析,提供订单进度控制的方法与模型。
The article offers some measures and models for the controlling of the order′s schedule through analyzing an example by the theory.
最后引入功能点分析模型在系统构建初期分析系统功能的复杂程度,从而为项目的计划和进度安排提供有力的依据。
Finally the paper measure how system's complexity is by Function Points Model at the beginning of the project to help project designer and developer carry on reasonable plan and time phasing.
动态管理模型能够本着节约的原则编制资源供应计划,并进行资源使用效果分析,配合进度计划改变资源投入。
The dynamic management model can workout resource providing plan by saving fundamental, and analyse there effect , assort the plan to change devotion.
在此基础上,提出了航空型号研制项目管理的进度控制模型。
On the basis of that, the aviation model development project management schedule control framework was proposed.
最后以火控雷达的概念设计为例,以研制费用和研制进度为约束条件建立模型,计算说明此模型是有效的。
Model is built by constraints of develop cost and schedule in the example fire control radar conceptual design, calculational conclusion demonstrates the effectiveness of the proposed model.
提出了核工程质量与进度集成控制网络计划技术及其网络图模型,介绍了该网络计划的编制和使用方法。
The network planning technique and its' network model is presented for nuclear project quality and schedule integration control.
结果显示,该模型能够帮助项目经理制定风险管理计划和合理的进度计划。
The results indicate that the simulation model can help project manager to prepare his risk management plan and schedule plan effectively and efficiently.
是否下载进度的某项或不应该在一些存储信息数据源(或模型)而不是在细胞(的视图)。
The information whether a download is in progress for a certain item or not should be stored in some data source (or model) and not in the cell (the view).
论文将进度预警模型应用于DS水闸枢纽工程,给出了进度点的警情值,从而为风险应对提供了理论依据。
The dissertation also applies schedule early-warning model to the DS waterlocks key project, gives the sign value of schedule points, provides risk handling with theory foundation accordingly.
文章基于预测技术,建立了设备工程进度控制的模型,并提出了设备工程进度目标控制界限的确定方法。
Based on forecast technique the time control models are built in the equipment engineering supervision. Then a novel method is proposed for the time control boundary.
随后分别从承包商和业主各自的角度构建了多模式项目支付进度的优化模型;
Then the optimization models of multi-mode project payment scheduling problems(MPPSP) are constructed from the contractor's and the client's viewpoints respectively.
对伙伴模型进行了形式化的描述,并重点对动态协作信息的表示,如伙伴学习进度、知识水平、认知能力和协作能力进行了研究。
The expressions of dynamic and collaborative information on peer, such as peer learning schedule, knowledge level, cognitive capability, and collaborative capability, were studied.
将项目全寿命周期中影响现金流的建设阶段和运营阶段结合起来研究加气站项目进度问题,构建了项目进度问题的模糊相关机会规划模型。
With a combination of construction and operation stages in project life cycle, gas filling station project schedule was studied, and a fuzzy dependent-chance programming model was established.
实例分析表明,该耦合模型对施工进度管理和决策有较好的指导作用。
The result of an example presents that the coupling model is useful for construction management and decision-making.
根据控制论的基本原理,建立了混凝土坝施工进度与质量实时控制的流程,研究了混凝土坝施工进度与质量实时预警模型。
The practical construction control procedure of concrete dam construction schedule and quality is brought out based on theory of cybernetics. The scheduling and quality monitoring model is proposed.
针对露天矿采掘进度计划优化编制问题,建立了一个数学模型,同时较充分地考虑了作业条件下的模型建立和问题的处理。
An optimized mining plan model was presented for opencast mines. During the development of the model, mining construction was given full consideration.
基于国内外有关研究成果和现阶段进度计划的实际编制方法,建立了一个动态进度计划的编制模型,并用计算机进行程序实现。
In this paper, a methodology is presented for making a dynamic progress schedule, and a macro program is written to automate this procedure.
在工程进度曲线的基础上,根据进度曲线所提供数据,运用灰色系统理论,建立一种进度偏差预测模型。
On the basis of the project progress curve and according to the data from it, the grey system theory is applied to establish a model for the prediction of progress deviation.