研究并实现了基于B/S模式的铁路工程形象进度图参数化生成系统(PIPGS)。
This paper investigates the design and implementation of project image progress parametric generating system based on B/S model for railway engineering(PIPGS).
您会看到一个进度窗口,如图14所示。
图10展示了在确认选项后您将收到的摘要和进度更新。
Figure 10 shows the summary and progress updates you'll receive after you confirm the choice.
图11:一个进度标识的例子。
图18显示迁移完成的进度。
Figure 18 shows percentage of progress of migration that has been taken place.
图2:预期的项目进度概况。
图4:进度中返工的影响。
考虑一下清单10中定义的线程,该线程将更新图4中的标签、进度条和滑块。
Consider the thread defined in Listing 10, which updates the label, progress bar and the slider in Figure 4.
有时柱状图也被称为甘特图,管理者用它能快而准地知道任何一天的工程进度,也能将实际进度和计划进行比较。
Bar charts, sometimes known as Gantt charts, allow managers to quickly see exactly where the project is at any given date and compare actual progress with planned progress.
计划通常是文件。不要陷入陷阱,例如,认为一张甘特横道图是一个计划,它仅仅是一张进度表而已。
Plans are always documents, don't fall into the trap of thinking that, for example, a Gantt chart is a plan - its only a schedule diagram.
图2显示了运行到一半时的进度条。
慕尼黑,基尔和斯图加特是进度最快的。
图11显示了开发进度定义(Developing Schedule Definition)业务用例实现的业务操作者如何合作来实现活动。
Figure 11 shows how the business workers of the Developing Schedule Definition business Use Case Realization cooperate to implement the activity.
图10显示了用三个业务操作者是如何实现开发进度定义(Developing Schedule Definition)业务用例的。
Figure 10 shows how the Developing Schedule Definition business use case is realized in terms of three business workers.
红色箭头表明出自于图7的开发进度定义(Developing Schedule Definition)业务用例支持由运作管理人员设定的业务目标。
The red arrow shows that the Developing Schedule Definition business use case from Figure 7 supports the business goal that is set by the Operations Manager.
如果您的工作区中现有您想要在当前的工作性能进度表中添加并配置的位置,那么就单击addExisting(图2)。
Click add existing (figure 2) if you have existing locations in your workspace that you want to add and configure to the current working performance schedule.
然后进度条会移动至100%,而且会有添加至您的脚本中的“ExecutionComplete”信息(图28)。
The progress bar moves to 100%, and an "Execution Complete" message is added to your script (Figure 28).
当您已经为执行步骤做好准备时,点击ApplyResultforStep1完成检查,而且执行进度条会移动至50%(图27)。
When you are ready to execute a step, click the Apply Result for step 1 gets checked off, and the execution progress bar moves to 50% (Figure 27).
根据已修改过的时程图展示已达成的进度。
Show the progress achieved by reference to a revised time chart.
图3详细描述了批量及进度开发(Batch andSchedule Development)业务流程(图2红色箭头标出的)。
Figure 3 details the Batch and Schedule Development business process (highlighted by a red arrow in Figure 2).
图25 - 4这是一个典型的警告对话框,它不仅不必要、不恰当,而且愚蠢地打断了进度。
Figure 25-4: a typical alert dialog box. It is unnecessary, inappropriate, and stops the proceedings with idiocy.
提出了核工程质量与进度集成控制网络计划技术及其网络图模型,介绍了该网络计划的编制和使用方法。
The network planning technique and its' network model is presented for nuclear project quality and schedule integration control.
每个视图都提供一个区域图,该图按指定持续时间内估计的总工作量,绘制已完成的工作进度。
Each view provides an area graph that charts the progress of completed work against the total estimated work for the specified time duration.
流程图将于选定专题时发下,大致描述专题如何随著学期进度而开展。
While choosing project assignments, a flowchart is provided as a general description of how the project may unfold as the semester progresses.
其中内业立体测图的方式和方法是提高精度的关键,它关系着整个工程的进度和质量。
In the industry of stereo mapping the way and the method is the key to improve the accuracy, which is related to the progress and quality of the whole project.
图24 - 5微软的这个进度表基本上是正确的。
施工设计包括:清单工程量计算、工程量清单报价(商务标)、施工技术标、施工进度计划及施工平面图的编制。
Construction design includes: a list of projects in terms of Quantity Price (Business standard), standard construction techniques, construction schedule and construction plan preparation.
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.
对于进度风险分析,可用优先顺序图法(PDM)进度。
The progress of risk analysis can be used in the order of priority Library (PDM) progress.
对于进度风险分析,可用优先顺序图法(PDM)进度。
The progress of risk analysis can be used in the order of priority Library (PDM) progress.
应用推荐