并通过施工总进度分析与优化、主要业务流程仿真运行改进,验证了该方法的可行性及实效性。
And the progress of construction through analysis and optimization, simulation run major business process improvement, test the feasibility of the method and effectiveness.
提出了结合柔性网络计划技术的进度分析与优化方法,包括工期分析及资源优化,在此基础上提出了基于可视化动态仿真的施工进度实时管理与控制方法;
The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;
报告测试进度有时候是测试结果的分析,有时候是对高层次的里程碑、状态门,或进入和退出标准。
Reporting testing progress is sometimes a forensic analysis of testing results, and sometimes it's reporting on high-level milestones, state gates, or entry and exit criteria.
当进度指示器达到100%并消失时,便表示分析已经执行完毕。
You will know your analysis has completed when the progress indicator reaches 100% and disappears.
在这周二课程的中途,巴尔加斯。略萨先生调整了课程进度,决定现在由学生们轮流坐在讲桌后面来分析博尔赫斯的作品。
Midway through class on Tuesday, Mr. Vargas Llosa switched gears, indicating that it was time for presentations by students, who take turns sitting at his desk and analyzing Borges's work.
同时,对项目的计划与进度控制过程中所使用的具体方法进行了研究,诸如swot分析、SWART原则、WBS分解等。
Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.
如果挣值分析表明项目提前于进度计划,并且低于预算,则赶工是惟一一项可行的选项。
C. Crashing is only a viable alternative if earned value analysis indicates that the project is ahead of schedule and under budget.
本文首先介绍了本项目的概况,在此基础上分析了项目工程的特点和施工重难点,指出项目进度控制是实施该项目的最关键部分。
At first, this paper introduced the overview of the project, and then analyzed its characteristics, importance and difference, and pointed out it 's the most crucial part to control the progress.
准备所需的报告,进度表和分析表。
Prepare other reports, schedules and analysis that may be required.
提出了基于模糊网络进度计划的施工索赔工期分析,建立计算模型并使之程序化。
Give the analysis of construction claims construction period based on Fuzzy-network progress plan, and make it as a calculate model program.
编制进度计划——分析工序顺序、工序持续时间和资源需求。
Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.
但现在我们要分析的进度,看看是否可以安排适当的固定装置。
But now we have to analyse the schedule and see if we can organise the fixtures properly.
进度偏差识别与分析方法。
运用网络计划蒙特卡洛仿真(MCS),从宏观的项目层和微观的工序层分别进行进度风险分析。
Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.
因此,在研发项目实施之前开展进度风险分析十分必要。
Therefore, it is of very importance to perform schedule risk analysis before the implementation of R&D project.
在大家一致通过的专案计划中,您的进度会是先分析、设计、开发、测试,最后才是交付。
With an agreed-upon project plan, you want to progress with analysis, design, development, testing, and eventually delivery.
举例来说,一个正式的工作分解结构,进度网络,挣值分析,改变控制过程等。
For example, a formal work breakdown structure, schedule network, earned value analysis, change control process and so on.
前言:沟槽式安装作为一种新工艺在消防管道中应用,从工程施工管理的三大目标(质量、进度、成本)分析应用的合理性。
The essay analyses the rationality of groove installation in the view of quality, construction and cost as a sort of new techniques applied in fire pipeline.
在相关遗传进度的分析中,干面筋的选择对其他品质性状有较大的增效作用。
In the analysis of correlated genetic gain, the selection for the dry gluten content had increasing effect on other quality characters.
在对常规施工进度计划编制方法分析的基础上,结合新工程条件的特点,就进度计划的编制技巧提出建设性探讨。
Based on the analysis for common methods of construction programme design with considering the new engineering condition, the author gives discussion on the skills of programme design.
这是分析活动顺序、持续时间、资源要求,以及进度制约因素和制定项目进度表所必需的过程。
This is the process necessary for analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
工程施工进度风险分析计算是施工进度控制中的重要环节。
In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.
分析了当前工程管理软件在进度管理上的不足。
The defect of the traditional project management software in the progress management is analyzed.
重点分析了运用“赢得值评估原理”实现工程项目进度控制的方法。
Methods for realizing project schedule control using the "earned value evaluation principle" were specially analyzed.
通过统计分析得到进度和费用的模拟概率分布,进而得到进度和费用风险曲线,为评价工程项目的风险提供了依据。
The probability distribution and risk curve of schedule and cost are obtained by statistic analysis, providing a basis for risk evaluation of engineering projects.
通过统计分析得到进度和费用的模拟概率分布,进而得到进度和费用风险曲线,为评价工程项目的风险提供了依据。
The probability distribution and risk curve of schedule and cost are obtained by statistic analysis, providing a basis for risk evaluation of engineering projects.