  • 通过施工进度分析优化主要业务流程仿真运行改进验证了该方法可行性实效性

    And the progress of construction through analysis and optimization, simulation run major business process improvement, test the feasibility of the method and effectiveness.

    youdao

  • 提出结合柔性网络计划技术进度分析与优化方法,包括工期分析资源优化,基础上提出了基于可视化动态仿真施工进度实时管理与控制方法;

    The methodology of visual dynamic simulation for construction schedule is presented in this thesis, visualization of founding model, calculating and result of schedule simulation is realization;

    youdao

  • 报告测试进度有时候测试结果分析,有时候是对高层次里程碑状态进入退出标准

    Reporting testing progress is sometimes a forensic analysis of testing results, and sometimes it's reporting on high-level milestones, state gates, or entry and exit criteria.

    youdao

  • 进度指示器达到100%消失时,便表示分析已经执行完毕

    You will know your analysis has completed when the progress indicator reaches 100% and disappears.

    youdao

  • 周二课程中途巴尔加斯。略萨先生调整了课程进度,决定现在学生轮流坐在讲桌后面来分析博尔赫斯的作品

    Midway through class on Tuesday, Mr. Vargas Llosa switched gears, indicating that it was time for presentations by students, who take turns sitting at his desk and analyzing Borges's work.

    youdao

  • 同时,对项目计划进度控制过程使用的具体方法进行了研究,诸如swot分析SWART原则WBS分解

    Meanwhile it also studied the feasible tools and methods used in project plan and schedule control, such as SWOT analysis, SWART principle, WBS etc.

    youdao

  • 如果分析表明项目提前进度计划并且低于预算,则赶工惟一一项可行选项

    C. Crashing is only a viable alternative if earned value analysis indicates that the project is ahead of schedule and under budget.

    youdao

  • 本文首先介绍本项目的概况,在此基础上分析项目工程特点施工难点,指出项目进度控制是实施该项目的关键部分

    At first, this paper introduced the overview of the project, and then analyzed its characteristics, importance and difference, and pointed out it 's the most crucial part to control the progress.

    youdao

  • 准备所需报告进度分析表。

    Prepare other reports, schedules and analysis that may be required.

    youdao

  • 提出基于模糊网络进度计划施工索赔工期分析,建立计算模型使程序化

    Give the analysis of construction claims construction period based on Fuzzy-network progress plan, and make it as a calculate model program.

    youdao

  • 编制进度计划——分析工序顺序、工序持续时间资源需求

    Schedule development-analyzing activity sequences, activity durations, and resource requirements to create the project schedule.

    youdao

  • 现在我们分析进度看看是否可以安排适当固定装置

    But now we have to analyse the schedule and see if we can organise the fixtures properly.

    youdao

  • 进度偏差识别分析方法

    The recognition and analysis methods of schedule deviation.

    youdao

  • 运用网络计划蒙特卡洛仿真(MCS),宏观项目微观的工序层分别进行进度风险分析

    Using Monte Carlo Simulation (MCS), project schedule risk analysis is implemented at both the macroscopic level of project and the microscopic level of activity.

    youdao

  • 因此,在研发项目实施之前开展进度风险分析十分必要

    Therefore, it is of very importance to perform schedule risk analysis before the implementation of R&D project.

    youdao

  • 在大家一致通过的专案计划中,进度会是先分析设计开发测试最后才是交付

    With an agreed-upon project plan, you want to progress with analysis, design, development, testing, and eventually delivery.

    youdao

  • 举例来说,一个正式工作分解结构进度网络分析改变控制过程

    For example, a formal work breakdown structure, schedule network, earned value analysis, change control process and so on.

    youdao

  • 前言:沟槽安装作为工艺消防管道应用,从工程施工管理三大目标(质量进度成本)分析应用的合理性

    The essay analyses the rationality of groove installation in the view of quality, construction and cost as a sort of new techniques applied in fire pipeline.

    youdao

  • 相关遗传进度分析中,面筋选择其他品质性状较大的增效作用

    In the analysis of correlated genetic gain, the selection for the dry gluten content had increasing effect on other quality characters.

    youdao

  • 在对常规施工进度计划编制方法分析基础结合工程条件的特点,就进度计划编制技巧提出建设性探讨

    Based on the analysis for common methods of construction programme design with considering the new engineering condition, the author gives discussion on the skills of programme design.

    youdao

  • 分析活动顺序持续时间资源要求以及进度制约因素制定项目进度必需过程

    This is the process necessary for analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.

    youdao

  • 工程施工进度风险分析计算施工进度控制中的重要环节

    In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.

    youdao

  • 分析当前工程管理软件进度管理上的不足

    The defect of the traditional project management software in the progress management is analyzed.

    youdao

  • 重点分析运用赢得评估原理实现工程项目进度控制方法

    Methods for realizing project schedule control using the "earned value evaluation principle" were specially analyzed.

    youdao

  • 通过统计分析得到进度费用模拟概率分布,进而得到进度和费用风险曲线评价工程项目的风险提供依据

    The probability distribution and risk curve of schedule and cost are obtained by statistic analysis, providing a basis for risk evaluation of engineering projects.

    youdao

  • 通过统计分析得到进度费用模拟概率分布,进而得到进度和费用风险曲线评价工程项目的风险提供依据

    The probability distribution and risk curve of schedule and cost are obtained by statistic analysis, providing a basis for risk evaluation of engineering projects.