这个例子使用响应时间崩溃选项(它是在测试调度下面被选中的),在测试运行时收集被捕获的页面元素的统计数字。
This example USES the response time breakdown option, which is selected under the schedule, to collect statistics on a captured page element when the test runs.
实验结果表明,即使在作业提交点分布不均匀且运行时间估计不准确情况下,爬山法仍可有效改善单地点作业的调度。
Results show hill climbing is efficient to improve the schedules of single-site jobs, even when the distribution of job submittal location is non-uniform or the runtime estimates are inaccurate.
据我了解,调度延迟是使任务运行时间再次发生。
As Far as I Understand, scheduler latency is the time incurred in making the task runnable again.
该算法适用于可并行任务,并在考虑到了任务集的截止期和资源因素基础上,加入了运行时间因素,达到了减少调度返回次数以及提高有效性的目的。
It takes processing time into account besides the deadline and resource requirement of the task sets in order to reduce scheduling backtracks and increase effectiveness.
道路运行时间、电铲装车时间等一类时间参数的预测是露天矿卡车调度系统中的一个重要问题。
Forecast of first-class time parameters such as truck "s travel time and shovel" s loading time is an important problem for truck dispatching system in open-pit mines.
道路运行时间、电铲装车时间等一类时间参数的预测是露天矿卡车调度系统中的一个重要问题。
Forecast of first-class time parameters such as truck "s travel time and shovel" s loading time is an important problem for truck dispatching system in open-pit mines.
应用推荐