实验结果表明,即使在作业提交点分布不均匀且运行时间估计不准确情况下,爬山法仍可有效改善单地点作业的调度。
Results show hill climbing is efficient to improve the schedules of single-site jobs, even when the distribution of job submittal location is non-uniform or the runtime estimates are inaccurate.
对于本文的最大估计运行时间为三个小时。
The maximum estimated running time for the tutorial is three hours.
对于本文的最大估计运行时间为三个小时。
The maximum estimated running time for the tutorial is three hours.
应用推荐