但是这些新解决方案必须要适应某些清晰定义的系统,这些系统必须已经在一个运维模型下明确地界定出来。
But these new solutions have to fit a clearly defined systems need that has been spelled out in an operational model.
HP代管的服务器——一整套包括管理、监控和维护等功能的解决方案,客户无需担心系统的运维。
HP Managed Server - a complete management, monitoring and maintenance solution so customers need not worry about the operating system.
变压器的垂直吊运与同变电室的其他高、低压配电柜同期进行,吊装前对吊装方案进一步论证和优化。
Vertical swinging of transformer and other high & low voltage switch boxes should be carried out simultaneously. Have further argument and optimization of hoisting plan before hoisting.
分析了济南市生活垃圾袋装化收运模式存在的问题,并提出相应的改进方案。
The problems of domestic waste bagging collection and transportation mode in Jinan city were analyzed, and the corresponding improving plan was put forward.
本文介绍了有关IDC的结构、业务类型、关键技术等内容,并探讨了铁路网运分离后,铁路企业网idc建设的方案。
This paper presents IDC's structure, type of services and key technologies, and discusses the project of IDC building in the Railway Intranet.
运用这一系统,可以优化铁路军事运输方案,提高铁运计划编制和铁路输送的效率。
By using this system we can optimize military railway transportation plans and improve the efficiency of military railway transportation.
电网全部或部分因故障停运后,采用黑启动方案,通过系统中具有自启动能力的机组带动无自启动能力的机组,可实现整个电网的恢复。
Under the condition of total or partial power net breakdown, system recovery can be realized by black-start scheme, in which units with self-start ability are used to bring others to start up.
从资产建造到最终停运,海卓泰特在石油天然气设备生命周期的各个阶段都能提供连接完整性解决方案。
From the construction of an asset to its final decommissioning, Hydratight provides joint integrity solutions at every stage of the lifecycle of an oil and gas facility.
根据实际要求,提出了高速运放调理和高速电子开关两种方案。
According to the practical requirements, two schemes, i. e. high-speed operational amplifier and high-speed electronic switch are proposed.
文章分析了直流接地引起主机停运的原因,并提出了改进方案,实施了防范措施。
This paper analyzes why dc system ground fault causes power unit outage and proposes improvement plans. The prevention measures are put into effect.
本文通过长运距带式输送机各种特殊工况的制动分析,提出了不同的可行方案。
The brake of all special circumstance of belt conveyor of long conveying distance is analyzed, and different feasible projects of secure brake are proposed.
通过动床波浪输沙模型试验,研究了日照帆船港3种设计方案的泥沙运移情况。
The movable-bed wave sediment transport model tests were used to study the sediment transport conditions for 3 design schemes of the Rizhao sailing harbor.
指出地铁在不停运的条件下,供电系统改造的难点和过渡方案存在的风险性;
It points out the difficulties in the renovation of the power supply system and the risks of the transitional scheme under the condition of operation without interruption.
介绍C70型敞车制动系统先进行油漆喷涂,再完成组装,实现运装货车[2006]179号文件的“三化一互换”设计质量目标的具体方案。
C70 gondola car brake system paint spraying and assembly is introduced to implementation the paper of179"Three Standardization One Interconvert"specific quality program objectives.
以邹县电厂三期和四期工程大件运输为例,对窄浅航道如何实现水陆转运的工艺方案加以分析。
Taking Zou County Power Plant Phase III & Phase IV projects as an example, this paper analyzes the way of realizing water-land transshipment of heavy equipment in narrow and shallow waterway.
经系统实际运行证明本设计方案用于对动物大脑皮层血运监测的可行性。
Actual operating system proves the feasibility of the design for monitoring animal cortex blood circulation.
系统投运以来,不断对控制方案和参数进行完善,使其更适应工艺生产的要求,取得良好的控制效果。
The control programme and parameters have been continually improved in order to meet the need of production and perfect control effect has been achieved since the system put into operation.
提供全自动控制组态模块; 培训一站式解决运维方案。
We have also formed our own large scale production and quality control system.
本文主要针对电厂铁路专用线在前期立项阶段,选择最优方案,确保电厂具有合理的运煤专用线。
In this paper, special railway line for the power plant project in the early stage, choose the best options to ensure that coal power plants with a reasonable private line.
并且以浦东国际机场T1航站楼为例,设计开发基于BIM技术的机场航站楼运维管理平台,就机场航站楼运维管理提出一套全新的解决方案。
Pudong International airport terminal T1, as an example, design and develop BIM technology-based platform for the airport terminal operation and maintenance management, to find a new set of solutions.
建设规模与产品方案:二道江发电公司正在建设2台200MW供热发电机组,预计2007年投运。
Construction Scale and Products Plan: Now Erdaojiang electricity Company is constructing two 200mw heating electricity machine groups, and will be operated in 2007.
系统投运后,效果很好,为国内大量引进的老旧退火炉的技术改造提供了有效的解决方案。
The system has been put into operation and control effect was very good. It provides effective so…
考虑到实际问题,我们选择方案一,采用了稳流电源运放方式,原理图如图一所示。
Taking into account the practical problems, one of our options using the steady flow mode power operational amplifier, schematic diagram shown in Figure 1.
考虑到实际问题,我们选择方案一,采用了稳流电源运放方式,原理图如图一所示。
Taking into account the practical problems, one of our options using the steady flow mode power operational amplifier, schematic diagram shown in Figure 1.
应用推荐