多阶段输电系统规划问题是一个复杂的非线性组合优化问题。
Optimal multistage transmission system expansion planning is a large-scale nonlinear combinatorial optimization problem.
与传统的输电系统规划相比,电力市场环境下的输电系统规划需要处理更多的不确定因素。
Comparing with traditional power transmission system planning, there are more uncertain factors to be processed during power transmission system planning under electricity market environment.
本文提出用于电力系统发电规划和输电规划负荷预测的时间序列分析法。
The time series analysis is proposed for load forecasting of power-generating and power transmission programming in power systems.
本文提出用于电力系统发电规划和输电规划负荷预测的时间序列分析法。
The time series analysis is proposed for load forecasting of power-generating and power transmission programming in power systems.
应用推荐