包管理器还维护着系统上安装的所有包的清单,可以预先检查前提条件和辅助条件是否满足。
The package manager also maintains a manifest of all packages installed on the system and can validate the existence of prerequisites and co-requisites beforehand.
本文以计数调整型抽样检查标准GB2828-87和ISO2859为例,说明了如何利用计算机辅助质量抽样检查,并介绍了笔者编制的计算机软件CASIA系统。
This paper shows how to make use of computers to facilitate sampling inspection based on GB2828-87 and ISO2859. A computer program CASIA is introduced.
包括:1、安装前的准备;2、设备的开箱检查和验收,各设备基础的检查和校正;3、各主要设备和辅助设备的就位;4、锅炉烟道系统的制作及安装。
Including: 1, Before installation: 2 the open-package inspection and acceptance of the equipment, the inspection and calibration equipment foundation, 3 the main equipment and auxiliary equipment 4.
此评价系统和利用计算机辅助检查和评估方法的结合在国内外同客船安全检查行业中处于领先水平。
The combination of the evaluation system and the inspection with computer AIDS keeps ahead in the area of passenger ship inspection throughout the world.
此评价系统和利用计算机辅助检查和评估方法的结合在国内外同客船安全检查行业中处于领先水平。
The combination of the evaluation system and the inspection with computer AIDS keeps ahead in the area of passenger ship inspection throughout the world.
应用推荐