向港调报告苏伊士运河吨位,载重吨以及吃水。
吃水标志(载重线标志)安装精确性检查。
Inspecting fitting accuracy of draught mark (loading line mark).
第44条(载重之限制)船舶载重线为最高吃水线,船舶航行时,其载重不得超过该线。
Article44the load line represents the maximum draft which shall not be submerged on her voyage.
本文提出利用两个吃水的载重量来估算空船重量的思想和方法,供设计师分析型船资料时作参考。
The paper provides a method to use two draught deadweights to estimate the weight of the empty ship. It serves a good reference to the designers.
本文提出利用两个吃水的载重量来估算空船重量的思想和方法,供设计师分析型船资料时作参考。
The paper provides a method to use two draught deadweights to estimate the weight of the empty ship. It serves a good reference to the designers.
应用推荐