它是在风动力作用下,由计算机控制软并网,然后主接触延时接通,实现正常发电运行。
Under the cut-in wind speed, the computer controls soft-cut-in network while the main contactor is delayed in action, then the wind turbine is getting into normal performance as generator.
它是在风动力作用下,由计算机控制软并网,然后主接触延时接通,实现正常发电运行。
Under the cut-in wind speed, the computer controls soft-cut-in network while the main contactor is delayed in action, then the wind turbine is getting into normal performance as generator.
应用推荐