论文的工作对中小型软件项目的风险管理提供了有价值的参考。
It is the value reference for the risk management of software project.
随着软件项目的进行,该风险管理模型能够利用不断更新的项目数据持续地预测潜在风险,确定风险源并采取适当的应对措施降低风险发生概率。
Using new project data obtained from the process of software development, it can continually predict risks, identify sources of risks, and take proper measure to reduce risk occurrence probability.
风险管理就是在软件开发过程中为避免事情发生错误而采取必要的措施,这些事情包括对质量产生不好的影响、时间期限、项目的费用。
Risk management means the actions taken to avoid things going wrong on a software development project, things that might negatively impact the quality, timeliness, or cost of a project.
本文系统研究了唐山软件产业园项目的风险管理。
This thesis studied systematically the threats management of Tangshan software industry base project.
该风险管理方法能够随着软件项目的进行持续地评估潜在风险,并采取适当的措施应对风险。
The method can assess risks continuously and take proper measures to respond to risks during software project.
该风险管理方法能够随着软件项目的进行持续地评估潜在风险,并采取适当的措施应对风险。
The method can assess risks continuously and take proper measures to respond to risks during software project.
应用推荐