将炼钢连铸生产计划中炉机优化匹配问题归结为一个不允许等待的混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。
A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.
基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
车间调度是一类作业排序问题,对于在现有资源条件下提高工作效率和经济效益有重要作用。
The job scheduling is a kind of job sequencing and important to advance work efficiency and economic performance.
炼钢-连铸生产的浇次组合与排序是带有工艺约束的并行机流水车间调度问题。
The cast grouping and ordering problem of steelmaking continuous casting hot rolling (SM-CC) is a combinatorial optimization problem.
大多数一般的多于两台机床的流水车间作业排序问题均属于NPC问题,在实际生产中一般采用启发式算法。
Most flow shop sequencing problems with more than two machines belong to NPC problem. People often use heuristic algoristic algorithms to deal with them in practice.
大多数一般的多于两台机床的流水车间作业排序问题均属于NPC问题,在实际生产中一般采用启发式算法。
Most flow shop sequencing problems with more than two machines belong to NPC problem. People often use heuristic algoristic algorithms to deal with them in practice.