备用荷载路径法是结构连续性倒塌分析中最常用的方法。
The alternative load path method is widely used to analyze the structural progressive collapse in civil engineering.
正演使用最短路径法射线追踪,反演采用SIRT方法。
Shortest path ray tracing is used in the forward step and SIRT in the inversion step.
在估计出混合矩阵的基础上,利用最短路径法分离出源信号。
Then, the source signals can be recovered by the shortest path method.
相对于理论路径而言,优化最短射线路径法得到的射线路径误差较小。
Compared with the theoretical path, the error of the ray path got by the optimized shortest ray path tracing method is minimum.
以序贯模块法作为流程模拟方法,采用可行路径法对两种流程进行了优化。
Carrying out simulation of process by sequential modular approach, optimization of slight boost pressure process and boost pressure process have been realized by feasible path method.
当前实用性较强的射线追踪方法,包括波前法,最短路径法,走时插值法,程函方程有限差分法等。
More practical ray tracing methods currently include the wavefront method, the shortest path method, the travel time epenthesis method, the eikonal equation finite difference method, etc.
当工程网络计划中活动持续时间为已知的确定值时,关键路径法被证明为是一个网络计划的有效方法。
When the durations of activities in a planning network are precisely known, Critical Path method has been proved to be a effective method to make planning.
并对关键链项目管理方法与传统的项目管理方法,如关键路径法、计划评审技术的优势和劣势进行了比较。
Then analyze the advantages and disadvantages of the traditional scheduling management method by comparison, such as CPM, PERT.
根据关键路径法和串行调度原理,论述了先序活动和后序活动时间参数计算的方法,并以实例阐述了计算原理。
According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.
当一个项目中的大多数活动同以往执行过很多次的其他活动类似时,通常采用关键路径法(CPM)进行计划编制。
When most of the activities in a project are similar to other activities that have been performed a large number of times, CPM scheduling is generally used.
该方法对印刷质量较差的粘连字符效果更好,可以作为常用的最短路径法的一个很好的补充算法,以提高分割成功率。
This proposed segmentation method behaves particularly good for poorly printed characters, and it can make a good supplement of the most often used shortest path method.
在介绍传统的调度方法的基础上,引进了关键路径法在自动生产调度上的运用,并介绍了关键路径法中的网络优化方法。
The paper introduces the traditional scheduling method, discusses the application of CPM on automatic production scheduling and introduces the network optimization method in CPM.
在第三章中,就项目管理中的进度管理进行了详细的讨论,分析了进度计划的几种主要方法(甘特图法、关键路径法、计划评审技术等),并指出了这几种方法的优缺点。
Chapter 3 of this thesis discusses schedule management in detail, analyses some methods to make schedule plan, for example, Gantt, CMP, and PERT, points out their advantages and disadvantages.
象棋大师们不可能计算所有走法,但是凭着直觉,他们可以透过这样接近无限多的可能性,“看见”一条取胜路径。
Chessmasters cannot possibly calculate all of them, but using intuition, they can "see" a way through this near-infinity to a winning move.
在我们初始的瀑布法项目中,我们有了一个关键路径,将我们的项目中的关键活动与其它项目中的关键活动关联在一起。
In our original waterfall project we had a critical path that aligned key activities in our project with key activities in their project.
消除这些错误消息的惟一方法是安装多路径驱动程序。
The only way to get rid of those error messages is to install a multipath driver.
许多研究已经证实,随着方法中路径数量的增加,理解和维护同一方法的难度也随之增加。
Many studies have confirmed that as the number of paths within a method increases, so does the difficulty of understanding and maintaining the same method.
法约尔和泰勒1900年左右对管理目的的描述,已经成为现代的经典:管理就是计划一条完成工作的最佳路径。
In the now-classical characterization delineated around 1900 by Henri Fayol and Frederick Taylor, the purpose of management was to plan the one overall best way to approach work.
通过利用某一方法路由不同的路径,这一基于整数的度量可适当地描述方法复杂度。
By counting the distinct paths through a method, this integer-based metric aptly depicts method complexity.
但是,可以为URL路径设置别名,这样就可以使用分类法词汇名称而不是ID。
There are, however, ways to alias the URL path so that the taxonomy term name can be used instead of the ID.
关键路径进度,识别和控制,项目故障及后果,关键链法,设计结构矩阵连接关键链。
Critical Path Scheduling, Identification and Control, Project Crashing and its Consequences, Critical Chain Method, DSM to Critical Chain Linking.
作者从“法—调制法—经济调制法”的路径展开论述,认为经济调制法的特殊品格是调制性与经济性。
The author launches elaboration from the way of "law - regulation law - economic regulation law" and thinks regulation and efficiency are special characters of economic regulation law.
采用打靶法求解非线性控制方程,绘出了圆板的热过屈曲平衡路径。
The nonlinear governing equations are solved numerically by adopting a shooting method and the equilibrium paths of thermal post-buckling of the circular plates are obtained.
针对峰值法中测量路径规划问题,提出了基于参数模型学习的神经网络预测器。
Aiming at measuring path planning by using peak value, neural network predictor based on parameter model is presented.
在OD调查的基础上,运用过江路径成本-时间分析法研究了陆路通道建成后对陆岛水上客流量的分流影响;
Secondly, on the basis of OD investigation, it applies the route cost-time model to analyze the shunt influence of the passenger flow caused by the land passage after it is completed.
本文提出一个解决基于拓扑的路径规划问题的新途径:图形法。
In this paper a graphic approach to the path planning problem based on the topological method is discussed.
当法向齿厚较大时,应该采用空间平行走刀方式规划刀具路径。
And when the thickness is large enough, the spatial parallel tool path should be adopted.
当法向齿厚较大时,应该采用空间平行走刀方式规划刀具路径。
And when the thickness is large enough, the spatial parallel tool path should be adopted.
应用推荐