在复兴大桥超高吨位灌注桩的静载试验,预应力混凝土反力装置替代了传统的钢梁反力系统。
The traditional steel beam reaction system was substituted by prestressed concrete reaction system in the ultrahigh static loading tests of bored piles of Fuxing Bridge.
在复兴大桥超高吨位灌注桩的静载试验,预应力混凝土反力装置替代了传统的钢梁反力系统。
The traditional steel beam reaction system was substituted by prestressed concrete reaction system in the ultrahigh static loading tests of bored piles of Fuxing Bridge.
应用推荐