随着优化级别的提高,编译源代码所用的编译时间和系统资源增加,而性能的提升幅度下降。
With each higher level of optimization, compile time and systems resources used to compiler the source code increase as the additional amount of performance squeezed out decreases.
因此,项目计划应该包含数据库优化活动的时间和资源。
Therefore, the project plan should include the necessary time and resources for database specific tuning activities.
这将使测试员可以在时间限制或者资源限制范围内,最优化配置覆盖率。
This enables testers to ensure that they optimize configuration coverage within their time or resource constraints.
结果,HighPerformance Unload可以并行执行卸载和加载过程,这优化了时间和资源。
As a result, High Performance unload performs the unloading and the loading processes in parallel, which optimizes time and resources.
而复杂的编译优化算法需要耗费大量的编译时间和资源。
But too complex and aggressive optimization algorithm will cost much compilation time and resources.
针对具有时间窗口和数传资源限制卫星数传调度问题,提出了基于解构造图模型的蚁群优化算法。
For satellite data transmission scheduling problem (SDTSP) restrained with time Windows and resources, ant colony optimization algorithm based on solution construction graph model is proposed.
建立了折衷考虑资源、时间和成本约束,以及决策节点的多项目环境下的经营过程配置优化解析模型。
The analytic model of business process assignment optimization is presented to undertake the trade-off among resource, time, cost constraints and decision nodes in multi-project environment.
针对资源有限最短时间的一类资源-时间优化问题,提出了混合单亲遗传算法进行求解。
In this paper, we propose a hybrid parthenogenetic algorithm approach to solve a general resources constrained and shortest time optimization problem.
在检修流程方面,分别以时间,资源利用,项目实施质量作为评判依据,进行分类别的精益优化。
All items in the maintenance project process are classified to be leaned and optimized according to the judging criteria of time, resource utilization, project implementation quality.
车间作业调度问题是一类具有时间约束、次序约束和资源约束的组合优化问题。
The Job shop scheduling problem is a combinatorial optimum problem that is constrained with time, sequence and resource.
必须要找到一种方法,充分考虑时间和资源约束,使二者达到动态的平衡,保证项目在成本、质量、时间的三个纬度下达到最优化。
So considering time and resource contain, it needs a method that can obtain dynamic balance between, obtain optimize in cost, quality, time.
协助生产经理制定瓶颈产能计划, 工艺时间测算及优化,提出人力资源优化的建议;
To assist production manager in development of bottle neck capacity plan, cycle time definition, resources planning and other staff plan requirement;
仿真结果表明,与传统链路恢复算法相比,子树恢复算法在网络资源利用上有明显的优化,也能缩短故障恢复时间。
Simulation results show that the new STP approach can improve network resources utilization compared with CRD-based schemes, and can also reduce the restoration time.
时间表问题是运筹学领域和系统工程领域中的典型组合优化问题,是由于事件对时间和空间的资源争夺而产生的,属于NP完全类问题。
Timetable problem is a typical problem of combined optimization in the fields of operational research and systems engineering, which belongs to NP problem.
车间调度的优化问题,作为制造企业的核心,是一类具有时间约束、次序约束以及资源约束的组合优化问题。
Job-Shop scheduling problem, as the core of manufacturing business, is a class of time constraints, sequence constraints, and resource constraints of the combinatorial optimization problem.
在此基础上,采用了先进的计算机技术和软件构建了以月为时间单元的基于水资源承载力的饮马河流域水资源优化配置模型。
Then taking optimal allocation of Yinma River basin as an example, according to region-specific, and an optimal allocation model of water resources in Yinma River basin is established.
研究结果表明,考虑运输因素的网络化制造资源优化配置方法能够有效降低总运输成本和时间,配置方案更贴合实际。
The research shows that the total transportation time and cost have been decreased by taking transportation factors into account, and the result becomes more practicable.
资源优化是工作流参数优化领域的热点,优化资源数量可以最大化地改善工作流时间性能。
Resource optimization is a hot spot in the field of the workflow optimization and optimizing the amount of resources can maximize the flow of time so as to improve performance.
研究了面向CAPP的制造资源预配置及其实现方法和以时间、质量、成本为约束的制造资源优化配置及其实现方法。
The CAPP-oriented advance configuration of manufacturing resources is studied and the implementation method is put forward. At last, according to the time, quality and cost, th...
研究了面向CAPP的制造资源预配置及其实现方法和以时间、质量、成本为约束的制造资源优化配置及其实现方法。
The CAPP-oriented advance configuration of manufacturing resources is studied and the implementation method is put forward. At last, according to the time, quality and cost, th...
应用推荐