对核运行费用的计算因其他燃料费用的下降而出现了偏差。
The arithmetic of nuclear running costs has been skewed by the fall in the cost of other fuels.
通过计算机系统的反馈验证,找出了偏差并制定了能控制最小运行费用的新优化运行方案。
By the feedback test of computer system, the deviation has been verified and such optimum operational program that could control the minimum operation cost has been set up.
此预算虽有小许偏差,但不可用其他业务支出的节约来分担额外费用。
Although minor deviation may be expected, it is not realistic to consider additional cost be Shared by other operational expenditure savings.
不幸的是,这一过程常常有偏差和误差,并且耗时、费用高。
Unfortunately, this process usually contains deviation and error, and consumes a great deal of time, and the expense is very high.
考虑到超短期负荷预测偏差的情况下,以购电费用变化量最小为目标函数重新调整发电计划,从而导致电网可用输电能力(atc)发生变化。
Because of super short-term load forecast error, ATC is changing with the adjustment of the generation scheduling by the object function that purchasing charge is least.
偏差分析法中的横道图法简单明了,能够准确表达出费用的绝对偏差。
In warp analysis, horizontal line method is simple and can exactly expression cost difference.
通过计算机系统的反馈验证,找出了偏差并制定了能控制最小运行费用的新优化运行方案。
By the feedback test of computer system, the deviation has been verified and such optimum operational program that could control the minimum operation c...
通过计算机系统的反馈验证,找出了偏差并制定了能控制最小运行费用的新优化运行方案。
By the feedback test of computer system, the deviation has been verified and such optimum operational program that could control the minimum operation c...
应用推荐