• 本文给出考虑负载变化率情况有功发电分配的最佳方法

    This paper presents an active generation scheduling method, which takes the Loading rate into account.

    youdao

  • 结果显示最大负载变化率作为衡量负载平衡程度指标有效,基于模型的预测性能实测性能总体趋势上基本吻合。

    The results show that the performance derived from the evaluation model is consistent with that of wall-time measurement on the whole.

    youdao

  • 结果显示最大负载变化率作为衡量负载平衡程度指标有效,基于模型的预测性能实测性能总体趋势上基本吻合。

    The results show that the performance derived from the evaluation model is consistent with that of wall-time measurement on the whole.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定