磨机负荷试运行阶段,主要探索使系统稳定运行的系统风量、磨机压差、入磨气体压力等工艺参数的控制。
And commissioning follows no load debugging of every system as main reducer lubrication system, roller mill pressure station and roller lubrication system.
表8 中所示的子部分描述了基准测试运行所使用到的模拟用户工作负荷场景。
The following subsections shown in Table 8 describe specific simulated user workload scenarios used in the benchmark test runs.
在负荷测试运行的过程中,测试团队应当密切关注以下几个方面的性能:cpu、内存、磁盘的使用情况、响应时间等等。
During load testing runs, the testing team will carefully monitor various aspects of performance: CPU, memory usage, disk usage, response time, etc.
设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
C设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
C设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
应用推荐