• 介绍预应力后张法弯矩施工检测技术

    This paper introduces the construction and test techniques for prestressed and post-tensioned negative moment.

    youdao

  • 据此,对连续组合梁弯矩调幅系数提出了建议。

    The proposed formulae for the moment redistribution ratio are valuable to the design of continuous composite beams.

    youdao

  • 试验中考虑弯矩长度预应力度两个主要因素

    Length of negative moment reinforcement and level of prestress were the main factors of the specimens.

    youdao

  • 研究负弯矩区截面未完全塑性时出现局部连续组合梁的稳定。

    Local buckling of continuous composite beams with non compact section is investigated.

    youdao

  • 得出了弯矩长度、预应力对无粘结预应力混凝土连续板影响

    The effect of different lengths of negative moment reinforcement and levels of prestress on the behavior of the slabs were also acquired.

    youdao

  • 研究了外部U形粘贴碳纤维加固钢筋混凝土弯矩区段斜截面受力特性

    This paper makes experimental study of stress character of reinforced concrete beam's oblique section in negative area strengthened with U-jackets carbon fiber reinforced polymer (CFRP).

    youdao

  • 最后给出了带锚固弯矩钢筋方案以及使用锚固板锚固设计建议

    Finally, design recommendations were put forward for the lapping inside the beam scheme of negative reinforcements with anchor end plates, and for the reinforcement anchoring with end plates.

    youdao

  • 连续组合梁在内支座负弯矩区段会出现混凝土拉、钢梁受压不利局面

    Adverse condition of concrete in tension and steel joist in compression occurs at inner support regions of continuous composite steel concrete beams.

    youdao

  • 墩顶负弯矩主要来自于二期恒载和活载。桥墩较高时,刚架桥简化连续梁桥计算。

    When the pier is high, rigid-framed bridge can be simplified to continuous beam bridge.

    youdao

  • 基于弹性无限空间幂级数不能计算格构弯矩区段,数值分析结果不符。

    The negative moment of the beam can not be concluded by the method based on the half-space elastic foundation theory, but the negative moment is proved by the numerical analysis.

    youdao

  • 计算表明,在正常设计工况下桩后前弯矩减少70%,弯矩减少了约10%。

    The results show that under normal conditions of the design, after adding piles, the moments of the front wall are reduced by about 70%, and the negative moments about 10%.

    youdao

  • 文章通过计算分析,发现可以支座弯矩调幅小梁间距办法满足侧向稳定要求

    This paper can satisfy the requirement with steady lateral buckling with the method that scales down the bending moment and abate the space between beams.

    youdao

  • 有必要可以弯矩配置承担一半以上弯距很适于使桥梁形成优美的曲线轮廓

    If desired, the hogging may be arranged to take more than half the total moment, which fits well with a graceful curved profile.

    youdao

  • 不同连续混凝土浇筑后连续预应力张拉顺序会导致永久支座弯矩区的应力储备不同。

    The cast of concrete at different end and the post-tensioning of continuous prestress make the negative bending moment section of the permanent support have different compressive stress reservation.

    youdao

  • 分析在正常使用极限状态下截面内力分别最大弯矩大正剪力两种工况应力分布规律

    Then take three-dimensional simulation for the model, and analyze the stress distribution when conditions maximum positive shear or maximum nagetive moment happens.

    youdao

  • 钢-混凝土组合连续梁桥中间支座附近弯矩区,导致桥面混凝土开裂缩短使用寿命

    Negative bending moment nearby the middle supports of composite steel-concrete continuous beam bridge, will cause floor deck concrete to crack and shorten its life.

    youdao

  • 试验表明,外包钢-混凝土组合梁弯矩钢筋外包钢梁通过连接措施有效地共同工作;

    Test results indicate that effective cooperation can be achieved by the shear-resistant connection between the reinforcement in the negative moment area and the outer-plated steel beam.

    youdao

  • 计算结果表明某些情况下地基趋于均匀,基础梁正弯矩显著减少,而弯矩则显著增大

    The results show, in some cases, that the pressure against the soil foundation tends to be even, the sagging bend moment of the foundation beam is reduced and the hogging bend moment of the fo...

    youdao

  • 组合框架于梁端存在弯矩设计构造组合梁复杂,限制了实际工程中的应用

    In negative moment region of composite frame beam, its design and the detail of struction are more complicated than that of simply supported composite beam, so it was seldom adopted in project.

    youdao

  • 主梁后浇结构墩顶梁端湿接头浇筑顺序以及墩顶负弯矩预应力筋张拉顺序支变连续梁桥施工关键工序

    The constructing procedure of the monolithic layer and the wet joints of the girders and the orders of straining the pre-stress force are the key orders of the simply supported-continuous system.

    youdao

  • 本文的主要特点板条选取荷载传递、简支不规则弯矩裂缝线以及支承板条板的剪切劈裂问题。

    The distinguishing features of the paper are selection of oblique strip and loading transmission, negative yielding line in irregular slab with simple supports, point support and shear split of slab.

    youdao

  • 本文的主要特点板条选取荷载传递、简支不规则弯矩裂缝线以及支承板条板的剪切劈裂问题。

    The distinguishing features of the paper are selection of oblique strip and loading transmission, negative yielding line in irregular slab with simple supports, point support and shear split of slab.