• “阿中小型工程规划设计洪水过程线计算主要方法

    The Alekceef's method is a main method to calculate flood hydrograph in the medium and small project planning and designing.

    youdao

  • 讨论了目前流域设计暴雨计算方面所存在问题,给出设计暴雨过程线概念定量方法

    The shortcomings of design storm over catchment is discussed. A basic concept of design storm curve and its determining method are given.

    youdao

  • 影响偏离主要因素为时段洪量设计值的抽样误差和典型过程线形状

    The main factor which may have a strong impact on such a deviation is the sample errors of certain flood volumes in a flood hydrograph.

    youdao

  • 影响偏离主要因素为时段洪量设计值的抽样误差和典型过程线形状

    The main factor which may have a strong impact on such a deviation is the sample errors of certain flood volumes in a flood hydrograph.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定