• 查清了隧道通过区的工程地质水文地质条件隧道设计提供了稳定可靠技术参数

    Then the engineering geology and hydrologic geology conditions along the tunnel were made clear and it provided reliable parameters for tunnel design .

    youdao

  • 岩石岩体构造、原岩应力水文地质条件、工程设计施工因素以及围岩应力等六个方面论述和探讨现场岩爆发生条件

    The Conditions of in situ rock-burst were probed into from rocks, rock mass structure, in-situ stress, hydrological conditions, engineering design and construction factors.

    youdao

  • 赵固井筒穿过冲积厚度达到528.85m地质水文地质条件复杂冻结设计施工难度较大。

    The alluvium thickness of air shaft in Zhaogu No. 2 Coal Mine is up to 528.85 m. The geologic and hydrographic conditions are complex, so it is very difficult for freezing design and construction.

    youdao

  • 赵固井筒穿过冲积厚度达到528.85m地质水文地质条件复杂冻结设计施工难度较大。

    The alluvium thickness of air shaft in Zhaogu No. 2 Coal Mine is up to 528.85 m. The geologic and hydrographic conditions are complex, so it is very difficult for freezing design and construction.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定