通过建设各方的努力,工程提前达到形象进度目标, 1997年大坝发挥了拦洪效益, 1998 年1号机组比设计工期提前1 年具备发电条件。
In 1997, the dam produced its benefit by retarding flood. In 1998, the No. 1 generating unit possessed the power generation conditions, which is one year ahead of time than that of its design.
通过建设各方的努力,工程提前达到形象进度目标, 1997年大坝发挥了拦洪效益, 1998 年1号机组比设计工期提前1 年具备发电条件。
In 1997, the dam produced its benefit by retarding flood. In 1998, the No. 1 generating unit possessed the power generation conditions, which is one year ahead of time than that of its design.